01DOCUMENTS & INFORMATION
Register Reservoir Study Inputs at Intake
The challengeWell logs, completion histories and fluid reports arrive without a consistent record of asset, well, vintage or intended use. Project teams cannot readily distinguish requested inputs from approved study data.
What we can buildCompare received files with an engagement-specific request register and capture source, receipt date, well identifier and document revision. Place unmatched or incomplete records in a review queue before adding them to the approved input set.
✓ Fewer unclassified files in the study input register.
From 99 USD
02DOCUMENTS & INFORMATION
Flag Production History Data Exceptions
The challengeMonthly oil, gas and water histories may contain duplicate periods, missing dates, inconsistent units or unexplained allocation changes. These issues can pass unnoticed into decline analysis or simulation preparation.
What we can buildCheck exported tables against agreed schemas, unit dictionaries and well-date uniqueness rules, then produce a row-level exception report. Route gaps and discontinuities to the data owner without automatically correcting values or treating a flag as an engineering conclusion.
✓ Lower unresolved production-data exception counts.
From 99 USD
03DOCUMENTS & INFORMATION
Check PVT Report Package Completeness
The challengeFluid-study packages may omit sample provenance, sampling conditions or supporting laboratory tables. Engineers must chase these details before assessing whether a report is suitable for the study.
What we can buildCheck each package against the study's required report sections and index sample identifiers, stated conditions and available test tables with source-page references. Send missing-item requests for review and leave fluid representativeness and model suitability to the responsible engineer.
✓ Shorter PVT package completeness-review time.
From 99 USD
04DOCUMENTS & INFORMATION
Assemble Pressure-Transient Review Packs
The challengePressure-transient interpretation is delayed when gauge files, rate histories, test chronology and well configuration records are stored separately. Missing time-zone or gauge-depth information creates additional clarification work.
What we can buildBuild a test-specific checklist and assemble references to raw pressure data, rate changes, event logs and completion diagrams. Flag missing timestamps, datum details and supporting records for engineer review before interpretation begins.
✓ Fewer incomplete pressure-test handovers.
From 99 USD
05DOCUMENTS & INFORMATION
Create Simulation Case Handover Manifests
The challengeA simulation handover can include several similarly named decks, restart files and output folders. Reviewers may struggle to establish which case generated the figures under discussion.
What we can buildCreate a manifest containing the case identifier, input-file checksums, simulator version as supplied, restart dependencies and output locations. Require the case owner to confirm the manifest before the handover is marked ready for review.
✓ Fewer simulation handovers with ambiguous case provenance.
From 99 USD
06DOCUMENTS & INFORMATION
Index Reserves Review Evidence
The challengeReserves review material spans forecasts, ownership assumptions, economic inputs and technical justifications. Missing links between a reported figure and its supporting evidence slow independent review.
What we can buildBuild an evidence index linking each reporting line to its effective date, source forecast, economic-input version and supporting rationale. Route missing evidence and inconsistent references to qualified reviewers without assigning reserves categories or approving disclosures.
✓ Higher evidence-link completeness in reserves review packs.
From 99 USD
07CLIENT COMMUNICATION
Coordinate New Asset Study Onboarding
The challengeNew assignments can start before data contacts, approval roles and delivery expectations are confirmed. Access requests and unresolved responsibilities then delay the first technical milestone.
What we can buildLaunch an onboarding checklist covering authorized contacts, asset boundaries, data-sharing arrangements, kickoff scheduling and approval responsibilities. Track each prerequisite and remind the assigned owner when an agreed onboarding task is overdue.
✓ Fewer overdue onboarding prerequisites.
From 69 USD
08CLIENT COMMUNICATION
Coordinate Missing Subsurface Data Requests
The challengeRepeated requests for well tests, injection histories or completion updates become scattered across email threads. Clients may resend the same material while other critical items remain outstanding.
What we can buildGenerate a consolidated request from the approved data-gap register, grouped by asset, well and client owner. Record responses against individual request items and prepare reminders only for outstanding items after the project coordinator checks their status.
✓ Lower outstanding client data-request counts.
From 99 USD
09CLIENT COMMUNICATION
Triage the Reservoir Project Inbox
The challengeA shared project inbox mixes file submissions, delivery questions, scope requests and technical challenges. Important client messages can wait while staff determine who should respond.
What we can buildClassify incoming messages by project and request type, then route them to the designated owner with relevant correspondence attached. Draft administrative responses from approved project records and escalate technical interpretations rather than answering them autonomously.
✓ Shorter time to assign incoming project requests.
From 39 USD
10CLIENT COMMUNICATION
Capture Technical Review Meeting Actions
The challengeHistory-match and forecast review meetings generate decisions, unresolved questions and requests for new sensitivities. Informal notes can blur the distinction between an agreed assumption and an option still under discussion.
What we can buildUsing authorized meeting notes or recordings, draft minutes that separate decisions, proposals, actions and open technical questions. Ask the meeting lead to confirm owners, due dates and decision wording before circulating the record.
✓ Fewer review actions without an assigned owner.
From 99 USD
11CLIENT COMMUNICATION
Escalate Client Satisfaction Concerns
The challengeConcerns about unclear uncertainty ranges, late review packs or inconsistent updates may appear in survey responses without reaching the engagement lead promptly. Unassigned follow-up leaves the client unsure whether the issue is being addressed.
What we can buildMonitor submitted satisfaction feedback against agreed escalation rules and attach the relevant engagement context. Assign a response owner, track the follow-up deadline and require human approval of any technical explanation or commercial commitment.
✓ Shorter time to assign client-concern follow-up.
From 69 USD
12TEAM OPERATIONS
Track Simulation Run Readiness and Handoffs
The challengeEngineers can lose track of which sensitivity cases are prepared, awaiting compute capacity, running or ready for review. Missing prerequisites cause avoidable handoff delays.
What we can buildMaintain a case register with required inputs, owner-confirmed readiness, run status and output-review responsibility using available status exports or approved updates. Flag blocked cases and stale statuses without assuming direct control of simulator execution.
✓ Fewer simulation cases with stale ownership or status.
From 99 USD
13TEAM OPERATIONS
Route History-Match Review Exceptions
The challengeReviewers spend time searching exported comparison tables for wells or periods that exceed agreed screening thresholds. Unexplained exceptions may be lost between successive model iterations.
What we can buildApply engineer-defined screening rules to exported observed-versus-simulated metrics and group exceptions by well, variable and period. Carry unresolved items into the next review queue with case references, leaving match acceptance and parameter changes to engineers.
✓ Fewer unassigned history-match review exceptions.
From 99 USD
14TEAM OPERATIONS
Control Development Forecast Assumptions
The challengeWell start dates, operating constraints and facility limits may differ between forecast spreadsheets, case notes and presentation tables. These inconsistencies complicate scenario comparison.
What we can buildMaintain an approved assumption register keyed to forecast scenario and revision, then compare submitted case metadata against it. Route differences for approval and identify affected report references without silently changing forecast inputs.
✓ Fewer unresolved forecast-assumption discrepancies.
From 99 USD
15TEAM OPERATIONS
Gate Technical Deliverables Before Issue
The challengeA reserves report or development study can reach the delivery stage while comments remain open or approval evidence is missing. Administrative readiness does not establish technical adequacy.
What we can buildCheck the deliverable register for completed review stages, resolved-comment status, correct effective dates and named sign-offs. Keep release tasks blocked until authorized professionals record the required approvals, including any applicable reporting-framework review.
✓ Fewer deliverables reaching release with incomplete approvals.
From 99 USD
16TEAM OPERATIONS
Validate Engineering Time Against Study Tasks
The challengeTime entries such as 'modelling' or 'client work' provide too little detail to distinguish approved study tasks from additional sensitivities. Incorrect phase codes create billing queries and project-cost uncertainty.
What we can buildCheck submitted time against engagement codes, task descriptions and approved scope-change references. Route ambiguous entries to the engineer or project manager before preparing the approved billing allocation.
✓ Fewer timesheet exceptions remaining at billing preparation.
From 49 USD
17TEAM OPERATIONS
Monitor Study Milestones and Contract Obligations
The challengeDelivery dates, client review windows and reporting obligations can be buried in engagement letters and amendments. Teams may miss a notice deadline when a late input affects the study schedule.
What we can buildExtract proposed obligations and milestone dates from approved contract documents for commercial-owner confirmation. Track confirmed deadlines, link prerequisite status and alert the engagement lead when an obligation needs attention without interpreting contractual rights autonomously.
✓ Fewer overdue contractual follow-up actions.
From 99 USD
18MARKETING & GROWTH
Qualify Reservoir Study Enquiries
The challengeEnquiries for reserves audits, simulation studies and acquisition support often omit asset maturity, data availability or decision timing. Business-development staff need a structured brief before involving specialist engineers.
What we can buildCapture the requested study type, basin, reservoir context, available data, required reporting framework and target decision date in a qualification record. Flag missing information and route the enquiry for human review of technical fit, capacity and any conflict concerns.
✓ Higher completeness of reservoir-study qualification records.
From 99 USD
19MARKETING & GROWTH
Draft Scoped Reservoir Engineering Proposals
The challengeProposal preparation requires repeated assembly of objectives, data requirements, deliverables, exclusions and review stages. Reused wording can promise work that the enquiry does not support.
What we can buildDraft a proposal from the approved enquiry brief and controlled service templates, explicitly listing assumptions, client dependencies and optional sensitivities. Route methodology, scope, fees and contractual wording to the relevant human approvers before issue.
✓ Shorter time to prepare proposals for internal review.
From 49 USD
20MARKETING & GROWTH
Follow Up Around Asset Decision Milestones
The challengeProspective studies may pause while operators await budget approval, data-room access or an investment committee date. Generic follow-ups ignore the milestone that actually determines whether work can proceed.
What we can buildRecord the prospect's stated decision milestone and agreed next-contact date, then prepare follow-ups referencing unresolved scope or data questions. Pause outreach when requested and send technical or commercial changes to the opportunity owner for approval.
✓ Fewer overdue agreed prospect follow-ups.
From 69 USD
21MARKETING & GROWTH
Identify Annual Reservoir Review Opportunities
The challengeCompleted engagements can be overlooked when annual reserves updates or planned forecast refreshes approach. Account teams may lack a clear record of what changed since the previous study.
What we can buildUse approved engagement dates and client-stated review cycles to flag potential follow-on work, then compile a brief of prior scope, known data updates and unresolved needs. Ask the account lead to confirm relevance before approaching the client, without implying that a new technical study is automatically necessary.
✓ Higher coverage of scheduled account-review opportunities.
From 99 USD
Displayed starting prices are indicative marketing-rounded estimates and may differ from WooCommerce checkout. The payable price and currency are confirmed separately. Custom workflow baseline: 399 PLN before conversion.