01MARKETING & GROWTH
Qualify Renovation Enquiries Before Estimator Review
The challengeNew enquiries often omit the property location, affected rooms, intended scope or target start date. Estimators must chase these details before assessing whether the work fits the business.
What we can buildCapture available enquiry details into a structured brief and request missing fields using approved questions. Apply agreed service-area and project-type criteria, then route the brief to an estimator with any uncertain answers highlighted.
✓ Shorter enquiry qualification turnaround.
From 99 USD
02CLIENT COMMUNICATION
Confirm Survey Visits and Recover Cancelled Slots
The challengeSite surveys are wasted when clients forget appointments or fail to arrange property access. Late cancellations leave estimators with avoidable gaps in their schedules.
What we can buildSend approved appointment reminders that request confirmation of attendance, access and any gate or parking instructions. Route cancellations to a rescheduling queue and offer only appointment options released by the scheduling team.
✓ Fewer missed survey appointments.
From 49 USD
03DOCUMENTS & INFORMATION
Check Estimates Before They Reach the Client
The challengeConstruction estimates can contain inconsistent quantities, missing exclusions or rates that differ from the approved pricing reference. These errors are harder to resolve once the client treats the estimate as the agreed scope.
What we can buildCompare draft estimates against the supplied scope checklist, approved rate references and required commercial fields. Flag discrepancies and route the estimate to an authorised estimator before release.
✓ Fewer estimate corrections after issue.
From 79 USD
04DOCUMENTS & INFORMATION
Assemble Proposals from Approved Project Inputs
The challengePreparing renovation proposals requires staff to copy scope descriptions, allowances and exclusions from several records. Reused documents can carry outdated project details or omit agreed assumptions.
What we can buildPopulate a proposal template from the approved estimate, scope notes and selected standard clauses, identifying any missing inputs. Route the draft for commercial review and issue it only after the required approval is recorded.
✓ Shorter proposal preparation time.
From 49 USD
05DOCUMENTS & INFORMATION
Route Drawing Revisions to Affected Work Packages
The challengeA revised drawing may reach the office without reaching the supervisor or subcontractor planning the affected work. Teams can continue using a superseded issue.
What we can buildRead supplied drawing numbers, revision references and issue dates to update a project register, flagging ambiguous metadata for review. Ask the document controller to confirm the revision and affected packages before distributing a notice and collecting acknowledgements.
✓ Fewer unacknowledged drawing revisions.
From 99 USD
06TEAM OPERATIONS
Track RFIs Against Upcoming Site Activities
The challengeQuestions about dimensions, finishes or design intent can remain buried in email while related work approaches. Supervisors then discover unresolved information when a trade is ready to start.
What we can buildTurn submitted questions into an RFI register with the drawing reference, responsible respondent, required-by date and affected activity. Chase overdue responses and alert the project manager to approaching blockers without interpreting or approving design answers.
✓ Fewer overdue RFIs at activity start.
From 99 USD
07DOCUMENTS & INFORMATION
Keep Variation Requests Separate from Approved Scope
The challengeClient requests made during a site visit can become instructions before their cost and programme implications are agreed. Later invoices may lack a clear approval trail.
What we can buildCapture each proposed change with its source message, scope description, supporting photos and affected work package. Request estimator and project-manager review, then route the proposal for the required client approval and flag related work as awaiting authorisation.
✓ Fewer variations without recorded approval.
From 99 USD
08DOCUMENTS & INFORMATION
Sort Supplier Invoices by Project and Trade
The challengeInvoices for materials, plant hire and subcontract work arrive in shared inboxes with inconsistent filenames. Accounts staff must open each file to identify the supplier and likely project.
What we can buildExtract invoice identifiers, supplier details and available project references, then classify documents using agreed project and trade rules. Send unreadable files, duplicates and uncertain allocations to a review queue before filing.
✓ Less invoice sorting time.
From 79 USD
09DOCUMENTS & INFORMATION
Reconcile Purchase Orders with Supplier Invoices
The challengeSupplier invoices may include different unit prices, additional delivery charges or quantities that exceed the purchase order. Manual checks become difficult when one order generates several invoices.
What we can buildCompare invoice lines and cumulative invoiced quantities with the corresponding purchase order using agreed tolerances. Flag price differences, unmatched items and apparent overbilling for accounts or buyer review before payment authorisation.
✓ Fewer unresolved purchase-order discrepancies.
From 79 USD
10TEAM OPERATIONS
Validate Labour Timesheets Against Job Codes
The challengeOperatives may submit hours against closed jobs, omit activity codes or accidentally duplicate entries. These gaps delay labour cost reporting and preparation of billable work records.
What we can buildCheck submitted timesheets against active project codes, required fields and duplicate-entry rules. Route exceptions to the supervisor and send reviewed entries to the appropriate project costing or billing queue through the agreed handoff.
✓ Fewer timesheet exceptions awaiting correction.
From 49 USD
11TEAM OPERATIONS
Track Permit and Inspection Readiness
The challengeA work package may be scheduled before required permit records, inspection bookings or professional sign-offs have been confirmed. Missing evidence can surface only when the crew is ready to proceed.
What we can buildMaintain a project-specific checklist defined by the responsible professional, linking each required item to its owner, evidence and target date. Flag missing or expired records before the scheduled activity and require an authorised person to confirm readiness.
✓ Fewer scheduled activities with unresolved readiness checks.
From 99 USD
12DOCUMENTS & INFORMATION
Prepare Evidence Packs for Progress Claims
The challengeProgress claims require staff to assemble valuation worksheets, site photos, delivery records and approved variations from separate locations. Missing support creates avoidable review questions.
What we can buildCollect referenced evidence into a draft claim pack and compare it with a checklist based on the project's agreed payment requirements. Highlight missing approvals and unsupported items for the quantity surveyor or commercial lead to review before submission.
✓ Fewer incomplete progress claim submissions.
From 99 USD
13CLIENT COMMUNICATION
Follow Up Due Invoices Without Chasing Disputed Claims
The challengeManual payment chasing can overlook overdue balances or send inappropriate reminders about disputed valuations. Accounts staff need project context before contacting the client.
What we can buildPrepare reminders from invoice due dates and recorded payment status, checking dispute and hold flags first. Route disputed items to the commercial lead and send only approved reminder wording through the agreed communication process.
✓ Fewer overdue invoices without a documented follow-up.
From 49 USD
14TEAM OPERATIONS
Escalate Supplier Deliveries That Threaten Site Dates
The challengeA delayed window order, kitchen delivery or steel package can block dependent trades. Supplier updates are often recorded separately from the dates the site team is working toward.
What we can buildCompare supplier-confirmed delivery dates with the project's required-on-site dates and request updates when confirmations are missing. Route late or uncertain deliveries to the buyer and project manager with the linked work package and recorded supplier correspondence.
✓ Earlier visibility of delivery-related schedule risks.
From 99 USD
15TEAM OPERATIONS
Match Site Delivery Receipts to Ordered Materials
The challengeSigned delivery notes can record partial deliveries without the office knowing which items remain outstanding. Missing or damaged materials may not be reflected in purchasing records.
What we can buildCapture receipt details and site-reported condition notes, then compare delivered items and quantities with the purchase order. Route shortages, excess quantities and damage reports to the buyer for confirmation and corrective action.
✓ Fewer unresolved goods-receipt discrepancies.
From 99 USD
16TEAM OPERATIONS
Prepare Trade Rescheduling Around Confirmed Constraints
The challengeTrade visits become unproductive when the previous activity is incomplete, materials are unavailable or the property cannot be accessed. Rescheduling requires repeated calls between the office, site team and client.
What we can buildCheck recorded predecessor completion, access confirmation and material availability before proposing trade appointments. Present feasible scheduling options to the coordinator, then prepare booking updates after approval.
✓ Fewer trade visits booked against known blockers.
From 99 USD
17TEAM OPERATIONS
Turn Supervisor Site Reports into Assigned Actions
The challengeDaily site notes and photos contain issues, dependencies and client questions that are easy to miss in long message threads. Follow-up tasks may have no named owner.
What we can buildSummarise submitted site reports into progress, blockers and proposed actions, retaining references to the source notes and photos. Ask the supervisor to confirm uncertain details, then route approved actions to named owners with due dates.
✓ Fewer site-report actions without an owner.
From 99 USD
18CLIENT COMMUNICATION
Chase Client Selections Before Procurement Cutoffs
The challengeUnconfirmed tiles, sanitaryware, paint finishes or kitchen fittings can delay ordering and installation. Choices made through separate messages are difficult to verify against the latest selection schedule.
What we can buildMaintain a selection register with room, item, approved allowance, decision owner and required-by date. Send targeted reminders, record the client's response and route substitutions or allowance changes for commercial and technical review before ordering.
✓ Fewer overdue client selections at procurement cutoff.
From 99 USD
19TEAM OPERATIONS
Coordinate Snag Lists and Verify Closure Evidence
The challengeDefects and incomplete items are logged across walk-through notes, photos and client emails. Items can be marked complete without evidence or without the responsible reviewer checking the repair.
What we can buildCreate location-specific snag records with a description, photo reference, assigned trade and target date, flagging possible duplicates for review. Request completion evidence and leave final closure to the designated inspector or project representative.
✓ Fewer snag items closed without verification.
From 99 USD
20DOCUMENTS & INFORMATION
Assemble Handover Packs Against a Project Checklist
The challengeManuals, warranties, certificates and as-built records arrive from different subcontractors near completion. Missing documents delay the preparation of a usable client handover pack.
What we can buildIndex received documents by system, trade and required handover item, then request missing records from the responsible party. Prepare a draft pack and an exceptions list for the project lead, leaving document validity and technical acceptance to authorised reviewers.
✓ Fewer missing documents at handover review.
From 99 USD
21MARKETING & GROWTH
Follow Up Issued Quotes with Project-Specific Questions
The challengeEstimators may issue a detailed renovation quote and then lose track of the client's decision date. Generic chasing can ignore known concerns about scope, access or programme.
What we can buildSchedule follow-ups using the quote issue date, agreed decision window and recorded client questions. Draft relevant messages, stop the sequence when the client replies or declines, and route scope or price negotiations back to the estimator.
✓ Fewer open quotes without a scheduled next action.
From 79 USD
Displayed starting prices are indicative marketing-rounded estimates and may differ from WooCommerce checkout. The payable price and currency are confirmed separately. Custom workflow baseline: 399 PLN before conversion.