01MARKETING ET CROISSANCE
Qualify Renovation Enquiries Before Estimator Review
Le défiNew enquiries often omit the property location, affected rooms, intended scope or target start date. Estimators must chase these details before assessing whether the work fits the business.
Ce que nous pouvons construireCapture available enquiry details into a structured brief and request missing fields using approved questions. Apply agreed service-area and project-type criteria, then route the brief to an estimator with any uncertain answers highlighted.
✓ Shorter enquiry qualification turnaround.
À partir de 89 EUR
02COMMUNICATION AVEC LES CLIENTS
Confirm Survey Visits and Recover Cancelled Slots
Le défiSite surveys are wasted when clients forget appointments or fail to arrange property access. Late cancellations leave estimators with avoidable gaps in their schedules.
Ce que nous pouvons construireSend approved appointment reminders that request confirmation of attendance, access and any gate or parking instructions. Route cancellations to a rescheduling queue and offer only appointment options released by the scheduling team.
✓ Fewer missed survey appointments.
À partir de 49 EUR
03DOCUMENTS ET INFORMATIONS
Check Estimates Before They Reach the Client
Le défiConstruction estimates can contain inconsistent quantities, missing exclusions or rates that differ from the approved pricing reference. These errors are harder to resolve once the client treats the estimate as the agreed scope.
Ce que nous pouvons construireCompare draft estimates against the supplied scope checklist, approved rate references and required commercial fields. Flag discrepancies and route the estimate to an authorised estimator before release.
✓ Fewer estimate corrections after issue.
À partir de 69 EUR
04DOCUMENTS ET INFORMATIONS
Assemble Proposals from Approved Project Inputs
Le défiPreparing renovation proposals requires staff to copy scope descriptions, allowances and exclusions from several records. Reused documents can carry outdated project details or omit agreed assumptions.
Ce que nous pouvons construirePopulate a proposal template from the approved estimate, scope notes and selected standard clauses, identifying any missing inputs. Route the draft for commercial review and issue it only after the required approval is recorded.
✓ Shorter proposal preparation time.
À partir de 49 EUR
05DOCUMENTS ET INFORMATIONS
Route Drawing Revisions to Affected Work Packages
Le défiA revised drawing may reach the office without reaching the supervisor or subcontractor planning the affected work. Teams can continue using a superseded issue.
Ce que nous pouvons construireRead supplied drawing numbers, revision references and issue dates to update a project register, flagging ambiguous metadata for review. Ask the document controller to confirm the revision and affected packages before distributing a notice and collecting acknowledgements.
✓ Fewer unacknowledged drawing revisions.
À partir de 89 EUR
06FONCTIONNEMENT DE L'ÉQUIPE
Track RFIs Against Upcoming Site Activities
Le défiQuestions about dimensions, finishes or design intent can remain buried in email while related work approaches. Supervisors then discover unresolved information when a trade is ready to start.
Ce que nous pouvons construireTurn submitted questions into an RFI register with the drawing reference, responsible respondent, required-by date and affected activity. Chase overdue responses and alert the project manager to approaching blockers without interpreting or approving design answers.
✓ Fewer overdue RFIs at activity start.
À partir de 89 EUR
07DOCUMENTS ET INFORMATIONS
Keep Variation Requests Separate from Approved Scope
Le défiClient requests made during a site visit can become instructions before their cost and programme implications are agreed. Later invoices may lack a clear approval trail.
Ce que nous pouvons construireCapture each proposed change with its source message, scope description, supporting photos and affected work package. Request estimator and project-manager review, then route the proposal for the required client approval and flag related work as awaiting authorisation.
✓ Fewer variations without recorded approval.
À partir de 89 EUR
08DOCUMENTS ET INFORMATIONS
Sort Supplier Invoices by Project and Trade
Le défiInvoices for materials, plant hire and subcontract work arrive in shared inboxes with inconsistent filenames. Accounts staff must open each file to identify the supplier and likely project.
Ce que nous pouvons construireExtract invoice identifiers, supplier details and available project references, then classify documents using agreed project and trade rules. Send unreadable files, duplicates and uncertain allocations to a review queue before filing.
✓ Less invoice sorting time.
À partir de 69 EUR
09DOCUMENTS ET INFORMATIONS
Reconcile Purchase Orders with Supplier Invoices
Le défiSupplier invoices may include different unit prices, additional delivery charges or quantities that exceed the purchase order. Manual checks become difficult when one order generates several invoices.
Ce que nous pouvons construireCompare invoice lines and cumulative invoiced quantities with the corresponding purchase order using agreed tolerances. Flag price differences, unmatched items and apparent overbilling for accounts or buyer review before payment authorisation.
✓ Fewer unresolved purchase-order discrepancies.
À partir de 69 EUR
10FONCTIONNEMENT DE L'ÉQUIPE
Validate Labour Timesheets Against Job Codes
Le défiOperatives may submit hours against closed jobs, omit activity codes or accidentally duplicate entries. These gaps delay labour cost reporting and preparation of billable work records.
Ce que nous pouvons construireCheck submitted timesheets against active project codes, required fields and duplicate-entry rules. Route exceptions to the supervisor and send reviewed entries to the appropriate project costing or billing queue through the agreed handoff.
✓ Fewer timesheet exceptions awaiting correction.
À partir de 49 EUR
11FONCTIONNEMENT DE L'ÉQUIPE
Track Permit and Inspection Readiness
Le défiA work package may be scheduled before required permit records, inspection bookings or professional sign-offs have been confirmed. Missing evidence can surface only when the crew is ready to proceed.
Ce que nous pouvons construireMaintain a project-specific checklist defined by the responsible professional, linking each required item to its owner, evidence and target date. Flag missing or expired records before the scheduled activity and require an authorised person to confirm readiness.
✓ Fewer scheduled activities with unresolved readiness checks.
À partir de 89 EUR
12DOCUMENTS ET INFORMATIONS
Prepare Evidence Packs for Progress Claims
Le défiProgress claims require staff to assemble valuation worksheets, site photos, delivery records and approved variations from separate locations. Missing support creates avoidable review questions.
Ce que nous pouvons construireCollect referenced evidence into a draft claim pack and compare it with a checklist based on the project's agreed payment requirements. Highlight missing approvals and unsupported items for the quantity surveyor or commercial lead to review before submission.
✓ Fewer incomplete progress claim submissions.
À partir de 89 EUR
13COMMUNICATION AVEC LES CLIENTS
Follow Up Due Invoices Without Chasing Disputed Claims
Le défiManual payment chasing can overlook overdue balances or send inappropriate reminders about disputed valuations. Accounts staff need project context before contacting the client.
Ce que nous pouvons construirePrepare reminders from invoice due dates and recorded payment status, checking dispute and hold flags first. Route disputed items to the commercial lead and send only approved reminder wording through the agreed communication process.
✓ Fewer overdue invoices without a documented follow-up.
À partir de 49 EUR
14FONCTIONNEMENT DE L'ÉQUIPE
Escalate Supplier Deliveries That Threaten Site Dates
Le défiA delayed window order, kitchen delivery or steel package can block dependent trades. Supplier updates are often recorded separately from the dates the site team is working toward.
Ce que nous pouvons construireCompare supplier-confirmed delivery dates with the project's required-on-site dates and request updates when confirmations are missing. Route late or uncertain deliveries to the buyer and project manager with the linked work package and recorded supplier correspondence.
✓ Earlier visibility of delivery-related schedule risks.
À partir de 89 EUR
15FONCTIONNEMENT DE L'ÉQUIPE
Match Site Delivery Receipts to Ordered Materials
Le défiSigned delivery notes can record partial deliveries without the office knowing which items remain outstanding. Missing or damaged materials may not be reflected in purchasing records.
Ce que nous pouvons construireCapture receipt details and site-reported condition notes, then compare delivered items and quantities with the purchase order. Route shortages, excess quantities and damage reports to the buyer for confirmation and corrective action.
✓ Fewer unresolved goods-receipt discrepancies.
À partir de 89 EUR
16FONCTIONNEMENT DE L'ÉQUIPE
Prepare Trade Rescheduling Around Confirmed Constraints
Le défiTrade visits become unproductive when the previous activity is incomplete, materials are unavailable or the property cannot be accessed. Rescheduling requires repeated calls between the office, site team and client.
Ce que nous pouvons construireCheck recorded predecessor completion, access confirmation and material availability before proposing trade appointments. Present feasible scheduling options to the coordinator, then prepare booking updates after approval.
✓ Fewer trade visits booked against known blockers.
À partir de 89 EUR
17FONCTIONNEMENT DE L'ÉQUIPE
Turn Supervisor Site Reports into Assigned Actions
Le défiDaily site notes and photos contain issues, dependencies and client questions that are easy to miss in long message threads. Follow-up tasks may have no named owner.
Ce que nous pouvons construireSummarise submitted site reports into progress, blockers and proposed actions, retaining references to the source notes and photos. Ask the supervisor to confirm uncertain details, then route approved actions to named owners with due dates.
✓ Fewer site-report actions without an owner.
À partir de 89 EUR
18COMMUNICATION AVEC LES CLIENTS
Chase Client Selections Before Procurement Cutoffs
Le défiUnconfirmed tiles, sanitaryware, paint finishes or kitchen fittings can delay ordering and installation. Choices made through separate messages are difficult to verify against the latest selection schedule.
Ce que nous pouvons construireMaintain a selection register with room, item, approved allowance, decision owner and required-by date. Send targeted reminders, record the client's response and route substitutions or allowance changes for commercial and technical review before ordering.
✓ Fewer overdue client selections at procurement cutoff.
À partir de 89 EUR
19FONCTIONNEMENT DE L'ÉQUIPE
Coordinate Snag Lists and Verify Closure Evidence
Le défiDefects and incomplete items are logged across walk-through notes, photos and client emails. Items can be marked complete without evidence or without the responsible reviewer checking the repair.
Ce que nous pouvons construireCreate location-specific snag records with a description, photo reference, assigned trade and target date, flagging possible duplicates for review. Request completion evidence and leave final closure to the designated inspector or project representative.
✓ Fewer snag items closed without verification.
À partir de 89 EUR
20DOCUMENTS ET INFORMATIONS
Assemble Handover Packs Against a Project Checklist
Le défiManuals, warranties, certificates and as-built records arrive from different subcontractors near completion. Missing documents delay the preparation of a usable client handover pack.
Ce que nous pouvons construireIndex received documents by system, trade and required handover item, then request missing records from the responsible party. Prepare a draft pack and an exceptions list for the project lead, leaving document validity and technical acceptance to authorised reviewers.
✓ Fewer missing documents at handover review.
À partir de 89 EUR
21MARKETING ET CROISSANCE
Follow Up Issued Quotes with Project-Specific Questions
Le défiEstimators may issue a detailed renovation quote and then lose track of the client's decision date. Generic chasing can ignore known concerns about scope, access or programme.
Ce que nous pouvons construireSchedule follow-ups using the quote issue date, agreed decision window and recorded client questions. Draft relevant messages, stop the sequence when the client replies or declines, and route scope or price negotiations back to the estimator.
✓ Moins de dossiers en cours sans action suivante prévue.
À partir de 69 EUR
Les prix de départ affichés sont des estimations indicatives arrondies à des fins commerciales et peuvent différer de ceux indiqués lors du paiement sur WooCommerce. Le prix à payer et la devise sont confirmés séparément. Référence pour un workflow personnalisé : 399 PLN avant conversion.