Drawing Revision Distribution
El retoA revised structural drawing reaches the office while a subcontractor still holds the previous issue. Similar filenames make it difficult to identify which document is authorised for use.
Lo que podemos construirRead drawing numbers, revisions and issue statuses from incoming transmittals, then compare them with the controlled drawing register. Queue discrepancies for document control and notify affected package owners only after the authorised issue is confirmed.
✓ Fewer unresolved drawing revision discrepancies.
Desde 89 EUR
02DOCUMENTOS E INFORMACIÓN
RFI Ownership and Response Tracking
El retoRequests for information arrive without a clear design discipline, drawing reference or required response date. Site teams repeatedly chase the same unanswered question.
Lo que podemos construirCapture each RFI against its project, location and referenced documents, requesting missing fields before routing it to the designated coordinator. Track due dates, escalate overdue responses and return reviewed answers to the originating team.
✓ Shorter RFI response turnaround.
Desde 89 EUR
03DOCUMENTOS E INFORMACIÓN
Submittal Register and Resubmission Control
El retoProduct data, samples and shop drawings move between subcontractors and reviewers without consistent status updates. Rejected submissions can remain on the register without an assigned resubmission date.
Lo que podemos construirRegister each submission by specification section and package, check required attachments and route it through the agreed review sequence. Record the authorised disposition and create a linked resubmission task when revisions are requested.
✓ Fewer overdue submittal resubmissions.
Desde 89 EUR
04COMUNICACIÓN CON EL CLIENTE
Change Request Evidence and Approval Routing
El retoA client instruction may reach site before its scope, cost and programme implications are recorded. Commercial teams then struggle to connect the instruction with supporting correspondence and quotations.
Lo que podemos construirCreate a change record from the instruction, attach related drawings and quotations, and request scope, cost and time assessments from named reviewers. Route the assembled record through contractual approval steps without authorising changed work or determining entitlement.
✓ Fewer change requests missing approval evidence.
Desde 89 EUR
05OPERACIONES DEL EQUIPO
Daily Site Report Action Extraction
El retoDaily reports describe access restrictions, missing materials and trade clashes, but follow-up actions stay buried in narrative notes. The same obstruction can reappear across successive reports.
Lo que podemos construirSummarise submitted site reports by work area, trade and reported constraint, retaining links to the source notes and photographs. Draft actions for supervisor confirmation, assign confirmed owners and flag repeated unresolved issues.
✓ Shorter time from reported constraint to assigned action.
Desde 89 EUR
06DOCUMENTOS E INFORMACIÓN
Progress Meeting Minutes and Action Registers
El retoCoordination meetings produce decisions and commitments that are not consistently transferred into the project action register. Participants can disagree about responsibility or deadlines after the meeting.
Lo que podemos construirUse authorised meeting notes or transcripts to draft minutes with linked agenda items, proposed owners and due dates. Send the draft for chair review before distributing minutes and updating approved action records.
✓ Fewer meeting actions without an assigned owner.
Desde 89 EUR
07OPERACIONES DEL EQUIPO
Long-Lead Material Delivery Exceptions
El retoLate switchgear, glazing or mechanical equipment can threaten installation dates before the delay appears in a progress meeting. Supplier acknowledgements and revised delivery promises are scattered across correspondence.
Lo que podemos construirCompare supplier-confirmed dates with purchase order milestones and required-on-site dates for designated long-lead items. Flag slippage to procurement and planning, request a recovery update and retain each revised commitment for review.
✓ Earlier visibility of delivery-date slippage.
Desde 89 EUR
08OPERACIONES DEL EQUIPO
Delivery Ticket and Goods-Receipt Matching
El retoPartial deliveries of reinforcement, plasterboard or fixtures are recorded on tickets that do not clearly match purchase order lines. Quantity differences may remain unresolved until an invoice arrives.
Lo que podemos construirExtract order references, item descriptions and quantities from delivery records, then compare them with open order lines. Route shortages, excess quantities and unclear references to the receiving team before a reviewed receipt is recorded.
✓ Fewer unresolved delivery quantity discrepancies.
Desde 89 EUR
09OPERACIONES DEL EQUIPO
Site Purchase Approval by Cost Code
El retoUrgent site purchases can bypass package budgets or reach an approver without sufficient scope information. Commercial teams discover the commitment only after the supplier has been instructed.
Lo que podemos construirRequire a project, cost code, scope description and estimated value on each purchase request, then check configured approval limits and budget information where available. Route exceptions and authorised requests to the appropriate approver before a purchase order is released.
✓ Fewer purchase commitments lacking recorded approval.
Desde 69 EUR
10DOCUMENTOS E INFORMACIÓN
Supplier Invoice and Purchase Order Reconciliation
El retoSupplier invoices may include changed rates, duplicate lines or references to the wrong project order. Reviewers spend time locating the original order before they can investigate the difference.
Lo que podemos construirMatch invoice lines to purchase orders using supplier, order reference, item and value fields, applying agreed comparison tolerances. Present unmatched lines, rate differences and possible duplicates to accounts payable without treating a match as payment approval.
✓ Shorter invoice discrepancy review time.
Desde 69 EUR
11OPERACIONES DEL EQUIPO
Labour Timesheet and Project Allocation Checks
El retoCrew timesheets can contain overlapping shifts, missing supervisor approvals or hours charged to closed cost codes. Payroll and commercial teams must resolve the same errors separately.
Lo que podemos construirCheck submitted hours against configured shift rules, valid project codes and required supervisor sign-off, then route anomalies for correction. Prepare reviewed allocations for the appropriate payroll or project-billing handoff without deciding pay entitlement.
✓ Fewer timesheets returned for allocation errors.
Desde 49 EUR
12DOCUMENTOS E INFORMACIÓN
Subcontractor Certificate Expiry Tracking
El retoInsurance evidence, trade licences and other required subcontractor documents may expire during an active package. Administrators cannot easily see which records need renewal before the next work stage.
Lo que podemos construirMaintain document requirements by subcontractor and package, record stated expiry dates and request replacements ahead of configured deadlines. Send missing, expired or ambiguous evidence to the responsible reviewer; qualified personnel determine validity and work eligibility.
✓ Fewer expired documents awaiting review.
Desde 49 EUR
13OPERACIONES DEL EQUIPO
Inspection Hold-Point Readiness
El retoAn inspection is requested before test records, location details or prerequisite work are ready. Missed hold points can create rework and uncertainty about whether the next activity may proceed.
Lo que podemos construirCheck inspection requests against the configured inspection and test plan checklist, identifying missing prerequisites and evidence. Route complete requests to the authorised inspector and keep the hold point pending until an authorised release is recorded.
✓ Fewer inspection requests missing prerequisite evidence.
Desde 89 EUR
14OPERACIONES DEL EQUIPO
Defect Assignment and Verification
El retoPunch-list items contain unclear locations or duplicate photographs, and subcontractors report completion without verification. Project teams lose time reconciling competing defect lists.
Lo que podemos construirRegister defects by room, zone and trade, flag possible duplicates and request missing location details before assignment. Collect completion evidence and send it to the designated verifier, keeping items open until acceptance is recorded.
✓ Shorter defect verification turnaround.
Desde 89 EUR
15DOCUMENTOS E INFORMACIÓN
Asset-Based Handover Pack Completeness
El retoOperation manuals, warranties, test results and as-built references arrive in separate batches without a consistent asset link. Closeout reviewers must search folders to establish what is missing.
Lo que podemos construirCompare submitted documents with the agreed handover matrix by asset and subcontract package, checking required metadata and document status. Request missing items and assemble an indexed review pack for the project team's acceptance process.
✓ Fewer missing documents at handover review.
Desde 89 EUR
16COMUNICACIÓN CON EL CLIENTE
Client Progress Update Preparation
El retoClient reports require project managers to reconcile site progress, unresolved decisions and commercial updates manually. Unverified statements can slip into reports when source records are inconsistent.
Lo que podemos construirPrepare a draft update from approved progress records, milestone statuses and decision logs, linking each reported item to its source. Flag conflicting information and require project manager approval before sending the report to the client.
✓ Shorter client progress-report preparation time.
Desde 89 EUR
17COMUNICACIÓN CON EL CLIENTE
Approved Invoice Payment Reminders
El retoPayment reminders can be missed when applications, certified amounts and issued invoices have different statuses. Chasing a disputed or not-yet-due amount can create unnecessary client friction.
Lo que podemos construirCreate reminder queues only from reviewed invoice balances and configured due dates, excluding records flagged as disputed or pending certification. Draft project-specific reminders with invoice references and route sensitive or contract-dependent cases to the commercial team.
✓ Fewer overdue invoices without a follow-up record.
Desde 49 EUR
18OPERACIONES DEL EQUIPO
Lookahead Constraint Register Updates
El retoUpcoming work packages depend on access, design decisions, materials and predecessor activities tracked in different places. Constraints may remain invisible until a crew is ready to start.
Lo que podemos construirCompare the agreed lookahead activities with linked approval, delivery and access records, flagging missing or unresolved prerequisites. Draft constraint tasks for planner confirmation and track owners and due dates without changing the approved programme automatically.
✓ Fewer upcoming activities with unassigned constraints.
Desde 89 EUR
19MARKETING Y CRECIMIENTO
Construction Enquiry Qualification
El retoNew enquiries often omit the site location, project stage, procurement route or required start date. Estimators spend time chasing basic facts before deciding whether to pursue the opportunity.
Lo que podemos construirCapture enquiry details, request missing qualification fields and enrich the opportunity record with supplied project information. Apply agreed fit criteria to prioritise review, leaving bid or no-bid decisions with the commercial team.
✓ Fewer enquiries reaching estimators with incomplete briefs.
Desde 89 EUR
20MARKETING Y CRECIMIENTO
Construction Proposal Drafting and Approval
El retoTender proposals require repeated assembly of scope descriptions, exclusions and programme assumptions from approved estimating inputs. Outdated wording or missing approvals can delay submission.
Lo que podemos construirDraft the proposal from approved scope, estimate outputs and current templates, clearly marking missing inputs and assumptions. Route technical, commercial and contractual sections to designated reviewers before an authorised person approves release.
✓ Shorter proposal approval cycle time.
Desde 49 EUR
21COMUNICACIÓN CON EL CLIENTE
Post-Handover Defect and Warranty Triage
El retoOccupiers report faults without an asset identifier, access details or supporting photographs. The contractor must establish the location and responsible package before arranging a response.
Lo que podemos construirCollect the reported symptoms, location, asset reference and access constraints, then link the case to available handover and warranty records. Route it to the responsible coordinator, escalating safety-related reports immediately under the agreed procedure while leaving liability and coverage decisions to authorised reviewers.
✓ Shorter time to assign a post-handover case.
Desde 89 EUR
Los precios iniciales que se muestran son estimaciones orientativas redondeadas con fines comerciales y pueden diferir de los que aparecen en la página de pago de WooCommerce. El precio a pagar y la moneda se confirman por separado. Precio de referencia del flujo de trabajo personalizado: 399 PLN antes de la conversión.