01التسويق والنمو
Qualify Solar Inquiries Before the First Sales Call
التحديSales teams receive inquiries without enough information to determine service-area fit, property ownership or the customer's interest in solar, storage or both.
ما يمكننا بناؤهCollect the installation address, ownership status, utility provider, available consumption information and requested system type through an approved intake process. Apply your qualification rules, create a lead brief and route uncertain cases to sales without declaring technical suitability or financing eligibility.
✓ More complete qualified-lead records.
ابتداءً من 379 ريال سعودي
02التسويق والنمو
Resolve Duplicate Leads Without Mixing Properties
التحديA homeowner may inquire through several channels, while a landlord may submit multiple properties using the same email address. Incorrect merging can attach a quote or utility bill to the wrong site.
ما يمكننا بناؤهCompare contact details alongside normalized installation addresses and preserve channel history when identifying possible duplicates. Merge only records meeting approved confidence rules, and send shared-contact or conflicting-property cases for review.
✓ Fewer duplicate solar opportunities.
ابتداءً من 379 ريال سعودي
03التسويق والنمو
Follow Up on Solar Quotes at the Right Stage
التحديOpen quotes go quiet because customers still need a roof assessment, a financing discussion or clarification about battery backup. Generic reminders miss the actual blocker.
ما يمكننا بناؤهUse the recorded opportunity stage and last verified customer response to select an approved follow-up sequence. Create a task for the appropriate specialist when a customer raises structural, financial or technical questions, and stop outreach after an opt-out or closed opportunity.
✓ Fewer overdue quote follow-ups.
ابتداءً من 289 ريال سعودي
04التسويق والنمو
Check Solar Quotes Against Approved Inputs
التحديQuotes can contain mismatched panel quantities, outdated equipment pricing or storage options that do not match the approved scope. Customers may also receive documents based on an obsolete design revision.
ما يمكننا بناؤهCompare quote line items, equipment references, totals and stated assumptions against the designated design revision and approved commercial rules. Flag discrepancies and route the quote to authorized reviewers before release, including specialist review of performance estimates, incentives and financing statements.
✓ Fewer quote correction cycles.
ابتداءً من 289 ريال سعودي
05الوثائق والمعلومات
Assemble Solar Proposals From Controlled Templates
التحديSales staff copy proposal sections between jobs, leaving inconsistent exclusions, obsolete equipment descriptions or unsupported statements about expected savings.
ما يمكننا بناؤهPopulate an approved proposal template with verified property details, reviewed system specifications, scope exclusions and the applicable commercial terms. Attach the source revision references and route the complete proposal for technical and commercial approval before sending.
✓ Shorter proposal preparation time.
ابتداءً من 189 ريال سعودي
06التواصل مع العملاء
Start New Solar Projects With a Complete Customer Checklist
التحديSigned projects stall when access instructions, utility documentation, property approvals or customer contact preferences are still missing.
ما يمكننا بناؤهAfter staff confirm the signed agreement, generate a checklist based on the project type and request only the information needed for the next stage. Track outstanding items, send approved reminders and assign unresolved access or authorization issues to the project coordinator.
✓ Fewer incomplete onboarding checklists.
ابتداءً من 289 ريال سعودي
07التواصل مع العملاء
Route Shared-Inbox Messages to the Correct Solar Project
التحديMessages about installation dates, utility forms and post-installation faults arrive in the same inbox. Staff must identify the property and project stage before deciding who should respond.
ما يمكننا بناؤهClassify messages, match them to a project using approved identifiers and prepare a response from verified records where appropriate. Route uncertain matches, complaints and safety-related reports to the responsible team, with no automatic reassurance that a system is safe.
✓ Shorter customer-message routing time.
ابتداءً من 139 ريال سعودي
08الوثائق والمعلومات
Check Site-Survey Packs Before Design Handoff
التحديDesigners receive survey packs without readable service-panel images, roof measurements or notes about access restrictions. Missing evidence creates repeat requests and sometimes another visit.
ما يمكننا بناؤهCheck submitted files against the survey checklist for that project type, including required photos, measurements and equipment-label images. Flag missing or unreadable items and assign a correction task while leaving structural, electrical and roof-condition judgments to qualified reviewers.
✓ Fewer incomplete survey handoffs.
ابتداءً من 379 ريال سعودي
09الوثائق والمعلومات
Track Permit Packets and Correction Requests
التحديPermit applications lose momentum when staff cannot see which drawing revision was submitted or who owns an authority's correction request.
ما يمكننا بناؤهMaintain an authority-specific checklist from staff-verified requirements and record submission receipts, document revisions and correction deadlines. Convert reviewer comments into assigned tasks, then require qualified staff to approve revised drawings and responses before resubmission.
✓ Fewer overdue permit correction tasks.
ابتداءً من 379 ريال سعودي
10الوثائق والمعلومات
Coordinate Utility Interconnection Milestones
التحديUtility applications, meter requirements and permission-to-operate notices can be confused with local permit or inspection status. Customers may assume that completed installation means they can activate the system.
ما يمكننا بناؤهTrack the utility's verified application requirements, reference numbers, outstanding requests and supporting correspondence separately from local inspection records. Request missing information and notify staff of status changes, but mark permission to operate only after authorized review of the utility's actual approval.
✓ Fewer unresolved interconnection requests.
ابتداءً من 379 ريال سعودي
11عمليات الفريق
Schedule Installation Crews Against Readiness Gates
التحديCrews are booked before required approvals, staged equipment, site access or suitably qualified personnel are confirmed. Late discoveries force dispatchers to rebuild the schedule.
ما يمكننا بناؤهCheck staff-defined readiness gates and propose installation slots using crew availability, travel constraints and expected job duration. Route weather changes, qualification conflicts and dependency failures to dispatch for approval before confirming or changing customer appointments.
✓ Fewer readiness-related reschedules.
ابتداءً من 379 ريال سعودي
12الوثائق والمعلومات
Turn Field Reports Into Assigned Follow-Up Actions
التحديCrew notes about roof obstructions, damaged components or unfinished labeling remain buried in photos and job comments. Office staff cannot reliably distinguish completed work from unresolved issues.
ما يمكننا بناؤهSummarize submitted field notes and linked photos into completed work, reported exceptions and proposed follow-up tasks. Send the summary to the responsible supervisor for verification, with safety concerns escalated under company procedures rather than treated as routine administrative tasks.
✓ Fewer unassigned field-report actions.
ابتداءً من 379 ريال سعودي
13عمليات الفريق
Plan Solar Equipment Replenishment From Approved Demand
التحديProcurement teams may count all quoted projects as firm demand or overlook stock already reserved for scheduled installations. The result is an unreliable view of panel, inverter and mounting-component availability.
ما يمكننا بناؤهCalculate replenishment suggestions from approved project bills of materials, reservations, available stock and recorded supplier lead times. Flag projected shortages and route purchase suggestions for review without automatically substituting components or changing an approved design.
✓ Fewer projected material shortages.
ابتداءً من 479 ريال سعودي
14عمليات الفريق
Escalate Supplier Delays Before Installation Dates Slip
التحديChanged delivery dates for modules, inverters or batteries may remain in supplier emails until a warehouse team discovers the missing shipment.
ما يمكننا بناؤهCompare confirmed supplier dates and available shipment updates with the material-required dates on affected projects. Open an exception task showing impacted jobs, request a revised commitment and route any proposed substitution to procurement and technical reviewers.
✓ Earlier detection of delivery-date conflicts.
ابتداءً من 379 ريال سعودي
15عمليات الفريق
Reconcile Equipment Receipts With Solar Purchase Orders
التحديDeliveries can contain partial quantities, different model identifiers or visibly damaged equipment. Recording the shipment as fully received can make unavailable stock appear ready for installation.
ما يمكننا بناؤهCompare receiving records and packing slips with the purchase order, capturing quantities, model identifiers and reported condition. Route discrepancies for warehouse review and keep affected items unavailable for allocation until staff resolve the exception.
✓ Fewer unresolved receiving discrepancies.
ابتداءً من 379 ريال سعودي
16عمليات الفريق
Locate Installed Equipment Affected by a Recall
التحديWhen a manufacturer issues a safety notice, installers need to identify the affected serial numbers and installation addresses without searching every project folder.
ما يمكننا بناؤهMatch a staff-validated manufacturer notice against recorded serial or batch identifiers and flag incomplete equipment records for investigation. Prepare affected-project lists and assigned response tasks, with qualified staff approving the match criteria, customer instructions and any operational restrictions.
✓ Shorter affected-equipment identification time.
ابتداءً من 289 ريال سعودي
17الوثائق والمعلومات
Control Site-Driven Scope Changes
التحديUnexpected trenching, a service-panel change or a revised cable route can create verbal agreements that never reach the contract, design or purchasing records.
ما يمكننا بناؤهCapture the reported change with site evidence, the original scope reference and the proposed cost or schedule impact. Route it through technical, commercial and customer approval as applicable, then release revised tasks only after the required authorization is recorded.
✓ Fewer undocumented scope changes.
ابتداءً من 379 ريال سعودي
18التواصل مع العملاء
Send Payment Reminders Against Verified Milestones
التحديPayment reminders can reach customers before a contractual milestone is confirmed or while a billing dispute is open. Project teams then spend time explaining or withdrawing the message.
ما يمكننا بناؤهUse approved invoice records and staff-verified milestone status to identify balances eligible for reminders under the contract. Send approved messages with payment references, pause disputed or held accounts and route customer questions to the billing owner.
✓ Fewer overdue milestone invoices.
ابتداءً من 189 ريال سعودي
19الوثائق والمعلومات
Build a Verified Solar Handover Pack
التحديCustomers may receive equipment manuals but not the final equipment list, inspection record or clear instructions about activation status. Missing closeout records also complicate future service.
ما يمكننا بناؤهAssemble the applicable as-built records, serial numbers, warranties, commissioning evidence and customer guidance from approved project files. Check completeness and require technical sign-off, keeping inspection approval and utility permission to operate as separate documented milestones.
✓ More complete customer handover packs.
ابتداءً من 379 ريال سعودي
20التواصل مع العملاء
Prepare Solar Warranty Claims With the Right Evidence
التحديWarranty requests stall because equipment identifiers, purchase records, fault evidence or installer details are missing. Customers may interpret an open claim as confirmed coverage.
ما يمكننا بناؤهCollect the required claim information, associate it with the installed equipment and track requests for additional evidence, return authorization and manufacturer responses. Route coverage decisions and replacement proposals to authorized staff, and communicate only verified claim status to the customer.
✓ Fewer incomplete warranty submissions.
ابتداءً من 379 ريال سعودي
21عمليات الفريق
Triage Post-Installation Service Requests
التحديA monitoring connection issue, a generation complaint and a reported electrical hazard require different responses. An undifferentiated service queue can delay appropriate escalation.
ما يمكننا بناؤهClassify reported symptoms using approved triage rules, attach relevant project and equipment records and recommend routing based on technician qualifications and availability. Immediately escalate reported safety hazards under company procedures, leaving diagnosis, remote-control actions and repair decisions to qualified personnel.
✓ Shorter service-request assignment time.
ابتداءً من 379 ريال سعودي
الأسعار المبدئية المعروضة هي تقديرات إرشادية تم تقريبها لأغراض تسويقية، وقد تختلف عن السعر النهائي عند الدفع عبر WooCommerce. يتم تأكيد السعر النهائي والعملة بشكل منفصل. خط الأساس لسير العمل المخصص: 399 زلوتي بولندي قبل التحويل.