Drawing Revision Distribution
التحديA revised structural drawing reaches the office while a subcontractor still holds the previous issue. Similar filenames make it difficult to identify which document is authorised for use.
ما يمكننا بناؤهRead drawing numbers, revisions and issue statuses from incoming transmittals, then compare them with the controlled drawing register. Queue discrepancies for document control and notify affected package owners only after the authorised issue is confirmed.
✓ Fewer unresolved drawing revision discrepancies.
ابتداءً من 379 ريال سعودي
02الوثائق والمعلومات
RFI Ownership and Response Tracking
التحديRequests for information arrive without a clear design discipline, drawing reference or required response date. Site teams repeatedly chase the same unanswered question.
ما يمكننا بناؤهCapture each RFI against its project, location and referenced documents, requesting missing fields before routing it to the designated coordinator. Track due dates, escalate overdue responses and return reviewed answers to the originating team.
✓ Shorter RFI response turnaround.
ابتداءً من 379 ريال سعودي
03الوثائق والمعلومات
Submittal Register and Resubmission Control
التحديProduct data, samples and shop drawings move between subcontractors and reviewers without consistent status updates. Rejected submissions can remain on the register without an assigned resubmission date.
ما يمكننا بناؤهRegister each submission by specification section and package, check required attachments and route it through the agreed review sequence. Record the authorised disposition and create a linked resubmission task when revisions are requested.
✓ Fewer overdue submittal resubmissions.
ابتداءً من 379 ريال سعودي
04التواصل مع العملاء
Change Request Evidence and Approval Routing
التحديA client instruction may reach site before its scope, cost and programme implications are recorded. Commercial teams then struggle to connect the instruction with supporting correspondence and quotations.
ما يمكننا بناؤهCreate a change record from the instruction, attach related drawings and quotations, and request scope, cost and time assessments from named reviewers. Route the assembled record through contractual approval steps without authorising changed work or determining entitlement.
✓ Fewer change requests missing approval evidence.
ابتداءً من 379 ريال سعودي
05عمليات الفريق
Daily Site Report Action Extraction
التحديDaily reports describe access restrictions, missing materials and trade clashes, but follow-up actions stay buried in narrative notes. The same obstruction can reappear across successive reports.
ما يمكننا بناؤهSummarise submitted site reports by work area, trade and reported constraint, retaining links to the source notes and photographs. Draft actions for supervisor confirmation, assign confirmed owners and flag repeated unresolved issues.
✓ Shorter time from reported constraint to assigned action.
ابتداءً من 379 ريال سعودي
06الوثائق والمعلومات
Progress Meeting Minutes and Action Registers
التحديCoordination meetings produce decisions and commitments that are not consistently transferred into the project action register. Participants can disagree about responsibility or deadlines after the meeting.
ما يمكننا بناؤهUse authorised meeting notes or transcripts to draft minutes with linked agenda items, proposed owners and due dates. Send the draft for chair review before distributing minutes and updating approved action records.
✓ Fewer meeting actions without an assigned owner.
ابتداءً من 379 ريال سعودي
07عمليات الفريق
Long-Lead Material Delivery Exceptions
التحديLate switchgear, glazing or mechanical equipment can threaten installation dates before the delay appears in a progress meeting. Supplier acknowledgements and revised delivery promises are scattered across correspondence.
ما يمكننا بناؤهCompare supplier-confirmed dates with purchase order milestones and required-on-site dates for designated long-lead items. Flag slippage to procurement and planning, request a recovery update and retain each revised commitment for review.
✓ Earlier visibility of delivery-date slippage.
ابتداءً من 379 ريال سعودي
08عمليات الفريق
Delivery Ticket and Goods-Receipt Matching
التحديPartial deliveries of reinforcement, plasterboard or fixtures are recorded on tickets that do not clearly match purchase order lines. Quantity differences may remain unresolved until an invoice arrives.
ما يمكننا بناؤهExtract order references, item descriptions and quantities from delivery records, then compare them with open order lines. Route shortages, excess quantities and unclear references to the receiving team before a reviewed receipt is recorded.
✓ Fewer unresolved delivery quantity discrepancies.
ابتداءً من 379 ريال سعودي
09عمليات الفريق
Site Purchase Approval by Cost Code
التحديUrgent site purchases can bypass package budgets or reach an approver without sufficient scope information. Commercial teams discover the commitment only after the supplier has been instructed.
ما يمكننا بناؤهRequire a project, cost code, scope description and estimated value on each purchase request, then check configured approval limits and budget information where available. Route exceptions and authorised requests to the appropriate approver before a purchase order is released.
✓ Fewer purchase commitments lacking recorded approval.
ابتداءً من 289 ريال سعودي
10الوثائق والمعلومات
Supplier Invoice and Purchase Order Reconciliation
التحديSupplier invoices may include changed rates, duplicate lines or references to the wrong project order. Reviewers spend time locating the original order before they can investigate the difference.
ما يمكننا بناؤهMatch invoice lines to purchase orders using supplier, order reference, item and value fields, applying agreed comparison tolerances. Present unmatched lines, rate differences and possible duplicates to accounts payable without treating a match as payment approval.
✓ Shorter invoice discrepancy review time.
ابتداءً من 289 ريال سعودي
11عمليات الفريق
Labour Timesheet and Project Allocation Checks
التحديCrew timesheets can contain overlapping shifts, missing supervisor approvals or hours charged to closed cost codes. Payroll and commercial teams must resolve the same errors separately.
ما يمكننا بناؤهCheck submitted hours against configured shift rules, valid project codes and required supervisor sign-off, then route anomalies for correction. Prepare reviewed allocations for the appropriate payroll or project-billing handoff without deciding pay entitlement.
✓ Fewer timesheets returned for allocation errors.
ابتداءً من 189 ريال سعودي
12الوثائق والمعلومات
Subcontractor Certificate Expiry Tracking
التحديInsurance evidence, trade licences and other required subcontractor documents may expire during an active package. Administrators cannot easily see which records need renewal before the next work stage.
ما يمكننا بناؤهMaintain document requirements by subcontractor and package, record stated expiry dates and request replacements ahead of configured deadlines. Send missing, expired or ambiguous evidence to the responsible reviewer; qualified personnel determine validity and work eligibility.
✓ Fewer expired documents awaiting review.
ابتداءً من 189 ريال سعودي
13عمليات الفريق
Inspection Hold-Point Readiness
التحديAn inspection is requested before test records, location details or prerequisite work are ready. Missed hold points can create rework and uncertainty about whether the next activity may proceed.
ما يمكننا بناؤهCheck inspection requests against the configured inspection and test plan checklist, identifying missing prerequisites and evidence. Route complete requests to the authorised inspector and keep the hold point pending until an authorised release is recorded.
✓ Fewer inspection requests missing prerequisite evidence.
ابتداءً من 379 ريال سعودي
14عمليات الفريق
Defect Assignment and Verification
التحديPunch-list items contain unclear locations or duplicate photographs, and subcontractors report completion without verification. Project teams lose time reconciling competing defect lists.
ما يمكننا بناؤهRegister defects by room, zone and trade, flag possible duplicates and request missing location details before assignment. Collect completion evidence and send it to the designated verifier, keeping items open until acceptance is recorded.
✓ Shorter defect verification turnaround.
ابتداءً من 379 ريال سعودي
15الوثائق والمعلومات
Asset-Based Handover Pack Completeness
التحديOperation manuals, warranties, test results and as-built references arrive in separate batches without a consistent asset link. Closeout reviewers must search folders to establish what is missing.
ما يمكننا بناؤهCompare submitted documents with the agreed handover matrix by asset and subcontract package, checking required metadata and document status. Request missing items and assemble an indexed review pack for the project team's acceptance process.
✓ Fewer missing documents at handover review.
ابتداءً من 379 ريال سعودي
16التواصل مع العملاء
Client Progress Update Preparation
التحديClient reports require project managers to reconcile site progress, unresolved decisions and commercial updates manually. Unverified statements can slip into reports when source records are inconsistent.
ما يمكننا بناؤهPrepare a draft update from approved progress records, milestone statuses and decision logs, linking each reported item to its source. Flag conflicting information and require project manager approval before sending the report to the client.
✓ Shorter client progress-report preparation time.
ابتداءً من 379 ريال سعودي
17التواصل مع العملاء
Approved Invoice Payment Reminders
التحديPayment reminders can be missed when applications, certified amounts and issued invoices have different statuses. Chasing a disputed or not-yet-due amount can create unnecessary client friction.
ما يمكننا بناؤهCreate reminder queues only from reviewed invoice balances and configured due dates, excluding records flagged as disputed or pending certification. Draft project-specific reminders with invoice references and route sensitive or contract-dependent cases to the commercial team.
✓ Fewer overdue invoices without a follow-up record.
ابتداءً من 189 ريال سعودي
18عمليات الفريق
Lookahead Constraint Register Updates
التحديUpcoming work packages depend on access, design decisions, materials and predecessor activities tracked in different places. Constraints may remain invisible until a crew is ready to start.
ما يمكننا بناؤهCompare the agreed lookahead activities with linked approval, delivery and access records, flagging missing or unresolved prerequisites. Draft constraint tasks for planner confirmation and track owners and due dates without changing the approved programme automatically.
✓ Fewer upcoming activities with unassigned constraints.
ابتداءً من 379 ريال سعودي
19التسويق والنمو
Construction Enquiry Qualification
التحديNew enquiries often omit the site location, project stage, procurement route or required start date. Estimators spend time chasing basic facts before deciding whether to pursue the opportunity.
ما يمكننا بناؤهCapture enquiry details, request missing qualification fields and enrich the opportunity record with supplied project information. Apply agreed fit criteria to prioritise review, leaving bid or no-bid decisions with the commercial team.
✓ Fewer enquiries reaching estimators with incomplete briefs.
ابتداءً من 379 ريال سعودي
20التسويق والنمو
Construction Proposal Drafting and Approval
التحديTender proposals require repeated assembly of scope descriptions, exclusions and programme assumptions from approved estimating inputs. Outdated wording or missing approvals can delay submission.
ما يمكننا بناؤهDraft the proposal from approved scope, estimate outputs and current templates, clearly marking missing inputs and assumptions. Route technical, commercial and contractual sections to designated reviewers before an authorised person approves release.
✓ Shorter proposal approval cycle time.
ابتداءً من 189 ريال سعودي
21التواصل مع العملاء
Post-Handover Defect and Warranty Triage
التحديOccupiers report faults without an asset identifier, access details or supporting photographs. The contractor must establish the location and responsible package before arranging a response.
ما يمكننا بناؤهCollect the reported symptoms, location, asset reference and access constraints, then link the case to available handover and warranty records. Route it to the responsible coordinator, escalating safety-related reports immediately under the agreed procedure while leaving liability and coverage decisions to authorised reviewers.
✓ Shorter time to assign a post-handover case.
ابتداءً من 379 ريال سعودي