01الوثائق والمعلومات
Build a Verified Commercial Lease Register
التحديKey tenancy terms are scattered across executed leases, side letters and subsequent variations. A spreadsheet may show the original rent while omitting an agreed amendment.
ما يمكننا بناؤهExtract parties, premises, lease dates, rent provisions and document relationships into a draft register with page references. Require a designated reviewer to resolve conflicting documents and approve the record before downstream use.
✓ Fewer lease records with unresolved source conflicts.
ابتداءً من 379 ريال سعودي
02الوثائق والمعلومات
Track Break Options and Notice Deadlines
التحديBreak clauses and other notice provisions can depend on specific dates, service methods and conditions. A calendar reminder alone does not establish whether a notice is legally effective.
ما يمكننا بناؤهUse reviewer-approved lease obligations to create advance tasks, named owners and escalation dates, attaching the relevant clauses. Route notice preparation and service requirements to the appointed legal adviser rather than issuing notices automatically.
✓ Fewer contractual notice tasks left overdue.
ابتداءً من 379 ريال سعودي
03الوثائق والمعلومات
Prepare Rent Review Evidence Packs
التحديRent reviews stall while staff locate the applicable clause, previous review correspondence and required supporting evidence. Different review mechanisms require different calculations and professional input.
ما يمكننا بناؤهAssemble the approved review clause, current rent, prior adjustments and any required published index references into a dated review pack. Flag missing evidence and send proposed calculations to the appointed surveyor or finance reviewer before any tenant communication.
✓ Shorter preparation time for rent review packs.
ابتداءً من 379 ريال سعودي
04الوثائق والمعلومات
Assemble Service Charge Reconciliation Files
التحديYear-end service charge reconciliation requires expenditure to be checked against lease recoverability rules, apportionments and amounts already billed. Missing evidence creates repeated queries during review.
ما يمكننا بناؤهGroup expenditure by property, period and approved cost category, then apply reviewer-maintained apportionment rules to draft schedules. Flag exclusions, caps, void allocations and unsupported items for professional review before statements are issued.
✓ Fewer unsupported items in reconciliation review.
ابتداءً من 379 ريال سعودي
05الوثائق والمعلومات
Sort Supplier Invoices by Property and Entity
التحديInvoices arrive without consistent building references or are addressed to the wrong ownership entity. Accounts teams must identify the correct property before processing can begin.
ما يمكننا بناؤهExtract supplier, invoice number, date, amount, billed entity and site reference from incoming invoices. Suggest the property and cost category using approved reference data, routing ambiguous records and possible duplicates to an exception queue.
✓ Less manual invoice classification work.
ابتداءً من 289 ريال سعودي
06الوثائق والمعلومات
Match Contractor Invoices to Approved Purchase Orders
التحديContractor invoices may include unapproved extras or exceed the agreed scope for a building repair. Checking only the invoice total can miss line-level differences.
ما يمكننا بناؤهCompare invoice lines against approved purchase orders, recorded variations and available completion evidence. Route price, quantity and scope discrepancies to the property approver before the invoice enters the payment approval process.
✓ Fewer unmatched contractor invoices reaching payment review.
ابتداءً من 289 ريال سعودي
07عمليات الفريق
Allocate Rent Receipts to the Correct Tenancy
التحديTenants sometimes pay from an unfamiliar bank account, omit references or combine payments for several units. Unallocated receipts can make an otherwise current tenancy appear overdue.
ما يمكننا بناؤهCompare permitted bank transaction data with tenant references, open charges and documented payment patterns. Propose allocations and route ambiguous, partial or multi-tenancy receipts for finance approval before posting.
✓ Lower value of unresolved unallocated receipts.
ابتداءً من 289 ريال سعودي
08التواصل مع العملاء
Prioritise Rent Arrears and Track Payment Promises
التحديCollection lists often mix disputed service charges, missed rent payments and promises that have not yet fallen due. Staff can chase the wrong balance or overlook a broken commitment.
ما يمكننا بناؤهBuild a collection queue from approved ledger balances, dispute flags and recorded tenant commitments, ranking accounts by agreed arrears rules. Create follow-up tasks when promises fall due and require approval for sensitive correspondence or legal escalation.
✓ Fewer overdue payment promises without follow-up.
ابتداءً من 289 ريال سعودي
09التواصل مع العملاء
Coordinate New Tenant Handover Tasks
التحديA signed lease does not mean that tenant contacts, deposit records, utility responsibilities and access arrangements are complete. Missing handover items create confusion at occupation.
ما يمكننا بناؤهCreate a tenancy-specific checklist covering approved lease records, emergency contacts, required documents, meter readings and building induction. Assign each item to the responsible party and escalate incomplete prerequisites before the planned handover.
✓ Fewer incomplete tasks at tenant handover.
ابتداءً من 289 ريال سعودي
10التواصل مع العملاء
Route Tenant Emails with Property Context
التحديA shared property inbox receives rent queries, access requests, repair reports and lease questions in the same stream. Messages can be forwarded repeatedly without a clear owner.
ما يمكننا بناؤهClassify incoming messages using approved tenant and property records, attach the relevant tenancy reference and assign a responsible queue. Prepare source-based draft replies for routine questions while routing disputes, legal requests and sensitive information to staff.
✓ Shorter time to assign tenant enquiries.
ابتداءً من 139 ريال سعودي
11عمليات الفريق
Triage Building Faults and Maintenance Requests
التحديReports of water leaks, lift faults and heating problems often arrive with incomplete location or impact information. Routine issues can obscure reports that require immediate attention.
ما يمكننا بناؤهCapture the property, precise location, reported symptoms and available photos, then apply approved priority and escalation rules. Route tickets to the responsible maintenance team and immediately escalate reported danger through the established emergency procedure without treating automated triage as a safety assessment.
✓ Shorter time to route maintenance reports.
ابتداءً من 379 ريال سعودي
12عمليات الفريق
Schedule Contractor Visits Around Tenant Access
التحديContractors can arrive without the correct access contact, security instructions or permission to enter a tenanted unit. Failed visits delay repairs and generate repeated coordination.
ما يمكننا بناؤهMatch approved work orders with contractor availability, tenant access windows and building restrictions. Request attendance confirmation, send approved access instructions and route cancellations into a rescheduling queue.
✓ Fewer contractor visits lost to access problems.
ابتداءً من 379 ريال سعودي
13الوثائق والمعلومات
Monitor Contractor Insurance and Required Certificates
التحديContractor insurance documents and required trade certificates can expire between onboarding and a new work instruction. Property staff may discover missing evidence only when a contractor arrives.
ما يمكننا بناؤهMaintain a contractor document register with expiry dates, required document types and reviewer status, then request replacements before expiry. Flag missing or unreviewed evidence before new assignments and leave adequacy and eligibility decisions to authorised staff.
✓ Fewer contractor assignments with unresolved document gaps.
ابتداءً من 189 ريال سعودي
14عمليات الفريق
Flag Property Budget Pressure Before Further Commitments
التحديA building can appear within budget when approved but uninvoiced work is excluded from the expenditure view. Additional orders may be raised before the true position is visible.
ما يمكننا بناؤهCompare posted expenditure and open purchase commitments against approved property, cost-category and period budgets. Flag potential overruns with the underlying transactions and assign a review task before further discretionary commitments.
✓ Earlier visibility of property budget exceptions.
ابتداءً من 379 ريال سعودي
15عمليات الفريق
Route Capital Works Purchase Approvals
التحديRoof repairs, plant replacement and refurbishment purchases can require different approval levels and supporting quotations. Email approvals may omit the ownership entity or funding allocation.
ما يمكننا بناؤهCollect the property, purchasing entity, scope, quotations, proposed coding and funding source in a structured request. Apply approved authority thresholds, route the request to the required approvers and release it for ordering only after approval is recorded.
✓ Fewer capital purchase requests missing required approvals.
ابتداءً من 289 ريال سعودي
16عمليات الفريق
Investigate Utility Consumption Exceptions
التحديUnexpected water or electricity usage can be hidden by estimated readings, meter changes or billing-period differences. A high bill alone does not establish whether there is a leak or operational fault.
ما يمكننا بناؤهCompare meter and billing records against property-specific baselines while checking reading type, period length and known occupancy changes. Open an investigation task with the supporting evidence and refer suspected faults to qualified personnel.
✓ Shorter time to investigate utility consumption anomalies.
ابتداءً من 379 ريال سعودي
17عمليات الفريق
Turn Property Inspections into Assigned Actions
التحديInspection notes and photographs often remain in a report without separate tasks for access defects, damaged finishes or follow-up surveys. Owners cannot easily see which findings remain unresolved.
ما يمكننا بناؤهConvert inspection notes into a draft summary with property locations, source photographs and proposed actions. Have the inspector confirm findings and priorities, then assign approved tasks with due dates and required closure evidence.
✓ Fewer inspection findings without an assigned owner.
ابتداءً من 379 ريال سعودي
18التواصل مع العملاء
Prepare Tenant Renewal Opportunity Briefs
التحديRenewal discussions can begin without a consolidated view of lease expiry, current occupation, tenant correspondence and outstanding issues. Leasing teams spend time rebuilding the account history.
ما يمكننا بناؤهIdentify tenancies entering an owner-defined renewal planning window and assemble a brief from approved lease records, recorded tenant intentions and open service issues. Assign a relationship review task and require authorised approval for proposed terms and communications.
✓ More upcoming renewals with a completed review brief.
ابتداءً من 379 ريال سعودي
19التسويق والنمو
Qualify Commercial Space Enquiries by Unit Requirements
التحديEnquiries for vacant space often omit floor area, intended use, target occupation date or servicing requirements. Leasing staff cannot determine which available units merit a discussion.
ما يمكننا بناؤهCollect the prospect's stated requirements and compare them with approved unit data covering size, availability and known physical constraints. Create a structured lead record with missing-information tasks, leaving permitted-use, suitability and commercial decisions to the leasing team and relevant advisers.
✓ Fewer leasing enquiries with incomplete requirements.
ابتداءً من 379 ريال سعودي
20التسويق والنمو
Confirm Commercial Property Viewings and Recover Cancellations
التحديVacant-unit viewings require coordination between prospects, agents and building access contacts. Unconfirmed appointments and late cancellations waste attendance time.
ما يمكننا بناؤهSend approved confirmation requests and reminders containing the unit reference, meeting point and access requirements. When a prospect cancels or misses the appointment, offer available rescheduling options and update the responsible leasing contact.
✓ Fewer unconfirmed commercial property viewings.
ابتداءً من 189 ريال سعودي
21عمليات الفريق
Compile Weekly Portfolio Exception Reports
التحديOwners receive separate updates on arrears, vacancy, repairs and expenditure without a consistent reporting date. Important exceptions can be obscured by repetitive status commentary.
ما يمكننا بناؤهCompile approved property-level measures for a common reporting period, flag stale or missing sources and summarise material changes. Produce an exception report with supporting references, responsible owners and draft action items for management review.
✓ Less preparation time for weekly portfolio reporting.
ابتداءً من 189 ريال سعودي
الأسعار المبدئية المعروضة هي تقديرات إرشادية تم تقريبها لأغراض تسويقية، وقد تختلف عن السعر النهائي عند الدفع عبر WooCommerce. يتم تأكيد السعر النهائي والعملة بشكل منفصل. خط الأساس لسير العمل المخصص: 399 زلوتي بولندي قبل التحويل.