01الوثائق والمعلومات
Sort Distribution Supplier Invoices
التحديInvoices for meters, polyethylene pipe, fittings and excavation services arrive through different channels with inconsistent account and job references.
ما يمكننا بناؤهExtract invoice fields from approved intake sources, classify each invoice by configured expense type and route it to the relevant accounts-payable queue. Flag unreadable values, duplicate invoice identifiers and missing purchase-order references for review.
✓ Lower invoice classification rework.
ابتداءً من 289 ريال سعودي
02الوثائق والمعلومات
Reconcile Materials Invoices Against Purchase Orders
التحديPartial deliveries and changed line quantities make it difficult to verify invoices for pipe, valves and meter assemblies against purchasing records.
ما يمكننا بناؤهCompare invoice lines with approved purchase orders and available receipt records using configured quantity and price tolerances. Send mismatches, missing receipts and unapproved substitutions to purchasing or accounts payable without authorizing payment.
✓ Fewer unresolved invoice-matching exceptions.
ابتداءً من 289 ريال سعودي
03الوثائق والمعلومات
Track Required Supplier Certificates
التحديRequired material certificates and supplier documents can be missing, expired or disconnected from the purchase order and delivered item.
ما يمكننا بناؤهMaintain a requirement register by supplier and material type, associate submitted certificates with purchase-order or lot references, and request missing or expiring documents. Route document discrepancies to authorized quality or procurement staff without declaring materials technically acceptable.
✓ Fewer outstanding supplier-document requirements.
ابتداءً من 189 ريال سعودي
04الوثائق والمعلومات
Assemble Service Installation Completion Packets
التحديA completed service installation may have its as-built sketch, meter details, inspection evidence and test records stored in separate locations.
ما يمكننا بناؤهUse the service work-order identifier to assemble submitted records against a utility-approved checklist, preserving source links and document versions. Return missing-item tasks to the submitting team and route the packet to an authorized reviewer before administrative closeout.
✓ Shorter completion-packet review time.
ابتداءً من 379 ريال سعودي
05الوثائق والمعلومات
Check Easement and Permit Packet Completeness
التحديMain extensions can reach project review with missing parcel references, unsigned easement documents or permit conditions that have not been assigned an owner.
ما يمكننا بناؤهIndex documents by project and parcel, check for required fields and signatures, and extract stated permit dates and conditions into a review queue. Send legal interpretation, land-rights sufficiency and construction authorization to the responsible professionals.
✓ Fewer incomplete land-access review packets.
ابتداءً من 379 ريال سعودي
06التواصل مع العملاء
Organize the Customer Service Inbox
التحديMove-in questions, meter-access messages and bill inquiries arrive in a shared inbox without consistent account references or ownership.
ما يمكننا بناؤهClassify routine messages into approved administrative queues, request missing account details through approved channels and draft responses from current service policies. Display approved emergency-reporting instructions and route flagged safety-related content under existing procedures, without treating email or AI classification as an emergency service.
✓ Lower unassigned routine-message backlog.
ابتداءً من 139 ريال سعودي
07التواصل مع العملاء
Coordinate Routine Meter-Access Appointments
التحديRoutine meter inspections and exchanges require customer access, but appointment changes often remain in email threads rather than the scheduling queue.
ما يمكننا بناؤهMatch approved routine work orders to staff-approved availability, capture access constraints and send appointment confirmations or rescheduling options. Require scheduler approval where qualifications, work dependencies or service interruption conditions affect the visit, and exclude emergency dispatch.
✓ Fewer access-related appointment failures.
ابتداءً من 379 ريال سعودي
08التواصل مع العملاء
Resolve Unmatched Customer Payments
التحديBank transfers and remittances with incomplete account references leave payments unallocated or attached to the wrong investigation queue.
ما يمكننا بناؤهCompare approved payment records with account references, invoice identifiers and amounts under finance-approved matching rules. Stage proposed allocations and route ambiguous, duplicate or disputed matches to authorized staff before any ledger update.
✓ Lower unallocated-payment backlog.
ابتداءً من 289 ريال سعودي
09التواصل مع العملاء
Track Arrears Follow-Up and Payment Promises
التحديCustomer payment promises can be lost between calls, while disputed balances and assistance cases require different handling from routine arrears.
ما يمكننا بناؤهBuild a staff review queue using approved balance, aging and promise-date fields, applying configured exclusions and protection flags before drafting follow-up tasks. Track commitments for authorized review; never determine disconnection eligibility, affordability arrangements or collection action autonomously.
✓ Fewer overdue payment-promise follow-ups.
ابتداءً من 289 ريال سعودي
10التواصل مع العملاء
Escalate Billing and Service Complaints
التحديComplaints about estimated bills, missed visits and restoration communication can pass between teams without a clear response owner.
ما يمكننا بناؤهCreate a case with the account, complaint type, supporting records and applicable response deadline from approved policy. Assign an owner and escalate overdue cases, while routing safety allegations through established procedures and requiring staff approval of substantive resolutions.
✓ Fewer overdue complaint responses.
ابتداءً من 189 ريال سعودي
11عمليات الفريق
Validate Excavation Locate Request Intake
التحديExcavation notification records may contain incomplete dig-area descriptions, conflicting dates or missing contact details that require prompt administrative follow-up.
ما يمكننا بناؤهCheck incoming ticket records for utility-defined required fields, preserve the original notice and flag missing information or approaching deadlines for authorized locate coordinators. Do not determine facility location, issue clearance, perform marking or replace the established emergency and damage-prevention process.
✓ Fewer locate requests awaiting administrative clarification.
ابتداءً من 379 ريال سعودي
12عمليات الفريق
Reconcile Leak Survey Evidence With Assigned Segments
التحديSurvey submissions can lack a segment identifier, instrument reference or required attachment, leaving uncertainty about the completeness of the record set.
ما يمكننا بناؤهMatch submitted survey records to assigned segments and check utility-approved evidence requirements, creating follow-up tasks for missing or conflicting records. Route reported leak findings through established response procedures; qualified personnel determine survey acceptance, leak classification and required action.
✓ Fewer incomplete leak-survey records.
ابتداءً من 379 ريال سعودي
13عمليات الفريق
Prepare Regulator Maintenance Tasks and Parts Requests
التحديPlanned regulator-station maintenance can be delayed when due dates, asset records and approved spare-part requirements are maintained separately.
ما يمكننا بناؤهUse engineering-approved maintenance intervals and asset records to propose planner tasks, then compare specified spares with available stock and draft replenishment requests. Require authorized approval for schedule changes, parts selection and work execution; do not adjust pressure settings or control equipment.
✓ Fewer planned maintenance tasks awaiting specified spares.
ابتداءً من 379 ريال سعودي
14عمليات الفريق
Turn Field Visit Reports Into Reviewable Actions
التحديTechnician reports on meter cabinets, access restrictions and damaged labels can contain follow-up needs that remain buried in free-text notes.
ما يمكننا بناؤهSummarize submitted observations with links to the original report and photos, then draft follow-up tasks by asset and responsible team. Route reported hazards under approved escalation procedures and require qualified review before assigning technical severity or approving corrective work.
✓ Fewer unassigned field-report actions.
ابتداءً من 379 ريال سعودي
15عمليات الفريق
Monitor Required Training and Qualification Evidence
التحديTraining completions and operator qualification evidence may be recorded separately, making upcoming renewal reviews difficult to coordinate.
ما يمكننا بناؤهCompare staff role requirements with approved training and qualification records, flag missing evidence and send reminders before recorded due dates. Route conflicts to authorized training or qualification administrators without certifying competence or approving a person for covered work.
✓ Fewer overdue training-evidence reviews.
ابتداءً من 189 ريال سعودي
16عمليات الفريق
Forecast Approved Distribution Materials Replenishment
التحديMeter sets, service fittings and approved repair materials can run short when planned projects and routine usage are reviewed independently.
ما يمكننا بناؤهCombine approved material lists, scheduled work demand, historical usage and stock balances to propose replenishment quantities under purchasing rules. Keep emergency-reserve policies separate and require planner approval before ordering or changing approved material specifications.
✓ Fewer material-related planned-work delays.
ابتداءً من 479 ريال سعودي
17عمليات الفريق
Flag Supplier Delays Against Construction Need Dates
التحديA delayed pipe or valve shipment may not reach the project planner until a crew is already scheduled to use it.
ما يمكننا بناؤهCompare supplier acknowledgements and shipment updates with purchase-order milestones and approved project need dates. Route late, missing or conflicting updates to the buyer and planner, and draft supplier follow-up without automatically accepting substitutions or revising construction commitments.
✓ Earlier visibility of material-delivery exceptions.
ابتداءً من 379 ريال سعودي
18عمليات الفريق
Build Meter-Read Exception Investigation Packets
التحديUnusual consumption, repeated estimated reads and meter-exchange mismatches require staff to collect billing history and field records before investigation.
ما يمكننا بناؤهApply utility-approved exception rules to supplied readings and assemble relevant read history, meter identifiers, exchange dates and available service notes. Route the packet to metering or billing specialists without changing reads, inferring a safety condition or approving a rebill.
✓ Shorter meter-read exception investigation time.
ابتداءً من 379 ريال سعودي
19التسويق والنمو
Qualify New-Service and Main-Extension Inquiries
التحديBuilders and commercial customers often submit service inquiries without the site address, requested in-service date or appliance-load information needed for initial review.
ما يمكننا بناؤهCapture required project details, check supplied addresses against approved service-territory information and create an inquiry record with missing-data tasks. Route complete inquiries to the designated team without promising capacity, route feasibility, tariffs or construction dates.
✓ Higher completeness of new-service inquiry records.
ابتداءً من 379 ريال سعودي
20التسويق والنمو
Draft New-Service Proposals From Approved Inputs
التحديPreparing a commercial connection proposal requires staff to bring together approved scope, engineering assumptions and authorized cost inputs.
ما يمكننا بناؤهPopulate a controlled proposal template only from reviewed project information, flag missing approvals and route the draft to engineering and commercial reviewers. Keep feasibility, capacity, contribution charges and delivery commitments provisional until the responsible staff approve them.
✓ Shorter proposal preparation time.
ابتداءً من 189 ريال سعودي
21التسويق والنمو
Follow Up on Incomplete Builder Connection Opportunities
التحديBuilder connection inquiries can stall while teams wait for site plans, load schedules or confirmation of project timing.
ما يمكننا بناؤهTrack each opportunity's missing items and last response, then draft consent-aware follow-ups using approved templates and contact preferences. Pause outreach when requested and send changed scope or timing to the responsible planner rather than repeating unapproved availability claims.
✓ Fewer stalled inquiries awaiting customer information.
ابتداءً من 289 ريال سعودي
الأسعار المبدئية المعروضة هي تقديرات إرشادية تم تقريبها لأغراض تسويقية، وقد تختلف عن السعر النهائي عند الدفع عبر WooCommerce. يتم تأكيد السعر النهائي والعملة بشكل منفصل. خط الأساس لسير العمل المخصص: 399 زلوتي بولندي قبل التحويل.