01MARKETING ET CROISSANCE
Qualify New Architectural Project Enquiries
Le défiNew enquiries often omit the site location, intended use, budget range or required service stage. Architects spend initial calls establishing basic suitability rather than discussing the project.
Ce que nous pouvons construireExtract supplied details into an enquiry record and check them against the studio's agreed qualification fields. Draft questions for missing information and route the completed record to a director for a suitability decision.
✓ Fewer enquiries reaching director review with missing qualification fields.
À partir de 89 EUR
02MARKETING ET CROISSANCE
Prepare Fee Proposal Drafts for Approval
Le défiFee proposals require repeated assembly of project facts, service stages, exclusions and appointment assumptions. Copying an earlier proposal can leave the wrong deliverables or payment milestones in the draft.
Ce que nous pouvons construirePopulate an approved proposal template from the qualified brief and director-selected services, fee inputs and exclusions. Flag missing assumptions and route the draft for commercial and professional review before it can be sent.
✓ Shorter preparation time for review-ready fee proposal drafts.
À partir de 49 EUR
03COMMUNICATION AVEC LES CLIENTS
Track Client Onboarding Prerequisites
Le défiA commission may be treated as ready to start while the signed appointment, nominated decision-maker or existing survey information is still missing. These gaps create avoidable interruptions during early design work.
Ce que nous pouvons construireCreate onboarding tasks from the studio's project-type checklist and assign each requirement to the client or an internal owner. Track evidence received, prepare outstanding-item reminders and ask the project lead to confirm readiness.
✓ Fewer unresolved onboarding prerequisites at project commencement.
À partir de 69 EUR
04COMMUNICATION AVEC LES CLIENTS
Route the Shared Project Inbox
Le défiA shared studio inbox mixes prospective commissions, client decisions, consultant information and contractor questions. Important messages can sit with the wrong team or lack an accountable owner.
Ce que nous pouvons construireClassify messages using approved project references, sender records and enquiry types, then assign them to the relevant queue. Draft acknowledgements where permitted and send ambiguous matches or sensitive instructions for manual review.
✓ Shorter time from message receipt to accountable assignment.
À partir de 29 EUR
05COMMUNICATION AVEC LES CLIENTS
Turn Design Meetings into Reviewed Action Lists
Le défiDesign meetings generate decisions, unresolved options and actions that are difficult to distinguish in informal notes. A discussion can be mistaken for an approved client instruction.
Ce que nous pouvons construireUse authorised meeting notes or consented transcripts to draft minutes with separate sections for discussion, decisions and actions. Assign proposed owners and dates, then obtain the chair's approval before circulation or register updates.
✓ Fewer meeting actions without a recorded owner or due date.
À partir de 89 EUR
06COMMUNICATION AVEC LES CLIENTS
Maintain a Traceable Client Brief
Le défiRoom requirements, occupancy assumptions and client priorities evolve across emails and workshops. Designers may continue working from an older brief without noticing an unresolved requirement.
Ce que nous pouvons construireCompare newly recorded requirements with the approved brief and prepare a change summary linked to its source. Ask the project architect to resolve conflicts and obtain client approval before publishing a new brief version.
✓ Fewer unapproved requirement changes appearing in the active brief.
À partir de 89 EUR
07DOCUMENTS ET INFORMATIONS
Check Drawing Issue Registers Before Release
Le défiDrawing packages can contain inconsistent revision labels, missing sheets or a register that does not match the intended issue set. These administrative discrepancies complicate distribution and later retrieval.
Ce que nous pouvons construireCompare the proposed package filenames and supplied sheet metadata with the studio's issue register and naming rules. Produce an exception list and draft transmittal, leaving drawing content checks and issue authorisation to the responsible architect.
✓ Fewer register-to-package discrepancies at the release review.
À partir de 89 EUR
08DOCUMENTS ET INFORMATIONS
Chase Consultant Information Against Coordination Dates
Le défiStructural, services and specialist information may arrive in separate batches without clear status. Project architects repeatedly chase deliverables needed for the next coordination milestone.
Ce que nous pouvons construireMaintain a deliverables register with consultant owners, expected information, agreed dates and received versions. Prepare reminders for missing items and highlight dependencies, while the project architect confirms technical completeness and suitability.
✓ Fewer overdue consultant deliverables without a recorded follow-up.
À partir de 89 EUR
09FONCTIONNEMENT DE L'ÉQUIPE
Log and Assign Construction-Stage RFIs
Le défiRequests for information arrive through multiple channels and may omit the drawing reference or required response date. Duplicate questions can be answered separately without a shared record.
Ce que nous pouvons construireCapture each request in an RFI register, suggest possible duplicates and flag missing project or drawing references. Route it to the nominated professional, track the agreed response date and require approval before issuing a technical response.
✓ Fewer RFIs remaining unassigned beyond the studio's triage target.
À partir de 89 EUR
10COMMUNICATION AVEC LES CLIENTS
Record Scope Changes Before Work Is Instructed
Le défiRequests for revised layouts or additional design options can be buried in routine correspondence. The team may start work before scope, fee and programme implications have been considered.
Ce que nous pouvons construireCreate a proposed change record with the source request, affected deliverables and current approval status. Ask the project lead to assess implications and record client authorisation before changing the approved task brief.
✓ Fewer additional-service tasks started without recorded authorisation.
À partir de 89 EUR
11DOCUMENTS ET INFORMATIONS
Assemble Planning Submission Checklists
Le défiPlanning submission preparation involves coordinating drawings, forms and supporting reports against application-specific requirements. Missing documents can remain unnoticed until the final assembly stage.
Ce que nous pouvons construireBuild a submission checklist from requirements supplied or verified by the responsible professional, then track document owners, versions and readiness. Flag gaps for review; an authorised professional confirms requirements, validates the package and submits it.
✓ Fewer missing checklist items at pre-submission review.
À partir de 89 EUR
12FONCTIONNEMENT DE L'ÉQUIPE
Close Internal Design Review Comments
Le défiInternal reviews produce comments across marked-up drawings, notes and messages. Comments can be lost, closed without evidence or carried into later issues without a clear decision.
Ce que nous pouvons construireCapture comments with their drawing reference, reviewer, owner and target issue. Request a response or evidence link for each item and route proposed closures to the reviewer rather than treating a task update as technical acceptance.
✓ Fewer review comments lacking a documented disposition.
À partir de 89 EUR
13FONCTIONNEMENT DE L'ÉQUIPE
Convert Site Visit Notes into Draft Reports
Le défiSite observations, photographs and follow-up actions need to be assembled after each visit. Delayed write-ups make it harder to preserve the context of an observation.
Ce que nous pouvons construireOrganise authorised field notes and labelled photographs into the studio's report template with proposed action owners. Flag incomplete locations or references and require the visiting professional to verify observations, wording and distribution before issue.
✓ Shorter elapsed time between a site visit and report review.
À partir de 89 EUR
14DOCUMENTS ET INFORMATIONS
Track Material and Product Submittal Reviews
Le défiSamples, product data and proposed substitutions can arrive without specification references or supporting evidence. Review status becomes difficult to trace when responses remain in individual inboxes.
Ce que nous pouvons construireLog each submittal against the relevant specification reference and check for the documents required by the agreed review procedure. Route the package to the designated reviewer and record their response without automatically determining suitability or acceptance.
✓ Fewer submittals awaiting review because of missing administrative information.
À partir de 89 EUR
15FONCTIONNEMENT DE L'ÉQUIPE
Validate Timesheets by Project and Service Stage
Le défiTime entries may use closed project codes, omit a service stage or contain descriptions that do not support billing review. Corrections accumulate near invoice preparation.
Ce que nous pouvons construireCheck submitted time against active project codes, permitted stages and the studio's entry requirements. Return exceptions to the author and route corrected, approved records to the appropriate billing review queue without deciding chargeability automatically.
✓ Fewer timesheet exceptions remaining at the billing cut-off.
À partir de 49 EUR
16FONCTIONNEMENT DE L'ÉQUIPE
Match Reimbursable Expenses to Commissions
Le défiSurvey purchases, printing costs and project travel receipts may arrive without a project reference or evidence of client recoverability. Finance staff must reconstruct the context before preparing a billing schedule.
Ce que nous pouvons construireMatch expense records to project references and supporting documents, then compare them with approved reimbursement rules. Prepare a draft client-billing schedule and route uncertain allocations or recoverability questions to the responsible reviewer.
✓ Fewer project expenses awaiting allocation at billing review.
À partir de 89 EUR
17FONCTIONNEMENT DE L'ÉQUIPE
Sort Supplier Invoices into Project Review Queues
Le défiConsultant, model-making and print supplier invoices arrive alongside general studio overheads. Missing references and inconsistent file naming slow their delivery to the right reviewer.
Ce que nous pouvons construireExtract available invoice fields, classify the document using approved supplier and project rules, and suggest the relevant review queue. Flag missing identifiers and uncertain classifications before an authorised reviewer confirms accounting treatment or payment.
✓ Shorter time from invoice receipt to the correct review queue.
À partir de 69 EUR
18FONCTIONNEMENT DE L'ÉQUIPE
Prepare Payment Reminders for Issued Fee Invoices
Le défiProject teams and finance staff may separately chase the same fee invoice or overlook a client query. Routine reminders can continue even when the balance is disputed or payment has been reported.
Ce que nous pouvons construireUse the approved receivables record to identify invoices eligible for reminders and check for dispute, query or payment flags. Prepare messages referencing the invoice and project, with escalation handled by the designated finance owner.
✓ Fewer overdue fee invoices without a documented follow-up.
À partir de 49 EUR
19FONCTIONNEMENT DE L'ÉQUIPE
Flag Staffing Conflicts Before Drawing Milestones
Le défiSeveral projects can require the same architect or technician during overlapping issue periods. Conflicts may only become visible when promised review slots are already full.
Ce que nous pouvons construireCompare planned project tasks, required roles, staff availability and review milestones using the studio's scheduling records. Flag overloads and missing review capacity, then present reassignment options for the studio manager to approve.
✓ Fewer unresolved staffing conflicts at the weekly resource review.
À partir de 89 EUR
20DOCUMENTS ET INFORMATIONS
Prepare Appointment-Specific Project Handover Packs
Le défiAt project close, issued documents and outstanding actions may be scattered across folders and registers. The studio needs to distinguish its agreed handover duties from documents owed by other parties.
Ce que nous pouvons construireGenerate a checklist from the approved appointment and project handover requirements, then index the supplied documents and outstanding items. Ask the project lead to verify versions, responsibilities and completeness before authorising release.
✓ Fewer missing agreed deliverables at handover review.
À partir de 89 EUR
21MARKETING ET CROISSANCE
Monitor Project Photography Usage Rights
Le défiPortfolio images may have channel restrictions, attribution requirements or licence expiry dates. Marketing staff can struggle to confirm whether a particular image is cleared for a proposed use.
Ce que nous pouvons construireMaintain an asset register with recorded licences, permitted uses, attribution text and expiry dates, then compare planned uses against those fields. Flag missing evidence or restrictions for approval before publication; ambiguous rights require qualified review.
✓ Fewer planned image uses lacking documented permission.
À partir de 89 EUR
Les prix de départ affichés sont des estimations indicatives arrondies à des fins commerciales et peuvent différer de ceux indiqués lors du paiement sur WooCommerce. Le prix à payer et la devise sont confirmés séparément. Référence pour un workflow personnalisé : 399 PLN avant conversion.