01DOCUMENTS ET INFORMATIONS
Casualty Inbox Intake and Case Assembly
Le défiInitial salvage requests often mix vessel identifiers, casualty positions, photographs and callback details across forwarded email chains. Coordinators must reconstruct the request before they can brief the response team.
Ce que nous pouvons construireClassify incoming messages, extract stated vessel and incident details, and group attachments under a proposed casualty reference with source links. Flag uncertain matches and missing position timestamps for coordinator review before merging records or drafting clarification requests.
✓ More complete casualty intake records.
À partir de 29 EUR
02DOCUMENTS ET INFORMATIONS
Contract Notice and Reporting Deadline Tracking
Le défiSalvage agreements and related work orders can contain notice requirements, reporting intervals and approval conditions that are easy to lose during a response. Missing an obligation may create a commercial dispute even when the field work is documented.
Ce que nous pouvons construireExtract proposed obligations from the executed agreement and amendments, then require commercial or legal validation of deadlines, triggers and recipients. Track the validated obligations against the casualty and escalate approaching deadlines with links to the relevant clauses.
✓ Fewer overdue contractual notice tasks.
À partir de 89 EUR
03DOCUMENTS ET INFORMATIONS
Port Permission and Authority Submission Packs
Le défiRequests for wreck access, berth use, diving activity or waste landing may require different documents depending on the location and proposed operation. Teams can mistake a submitted application for an authorization to proceed.
Ce que nous pouvons construireUse a locally validated checklist to assemble the requested vessel details, method statements and supporting records into a versioned submission pack. Track submitted, queried, approved and expired statuses separately, leaving applicability and permission-to-proceed decisions to authorized personnel.
✓ Fewer incomplete authority submission packs.
À partir de 89 EUR
04DOCUMENTS ET INFORMATIONS
Daily Salvage Report Action Extraction
Le défiDaily reports contain progress notes, observed damage, resource requests and unresolved actions, but these details can disappear inside long narrative documents. Shore teams may miss an action when the next shift produces another report.
Ce que nous pouvons construireSummarize submitted field reports by casualty and reporting period, preserving links to observations and attachments. Propose action owners and due dates for supervisor confirmation, and distinguish reported observations from approved technical conclusions.
✓ Fewer unassigned daily-report actions.
À partir de 89 EUR
05DOCUMENTS ET INFORMATIONS
Legal Hold and Casualty Evidence Preservation
Le défiA casualty dispute or investigation can require preservation of photographs, correspondence, logs and document versions across multiple custodians. Routine deletion or overwritten files can undermine the available record.
Ce que nous pouvons construireOn receipt of an authorized legal hold, identify the specified casualty records and route preservation tasks to their custodians. Track acknowledgements and exceptions, retain available source metadata, and require legal authorization before changing the hold scope or releasing it.
✓ Fewer unacknowledged evidence-preservation tasks.
À partir de 89 EUR
06FONCTIONNEMENT DE L'ÉQUIPE
Salvage Resource Mobilization Scheduling
Le défiSalvage supervisors, technicians and specialist contractors may have overlapping assignments and different travel or site-access constraints. A tentative availability message can be mistaken for a confirmed deployment.
Ce que nous pouvons construireMatch approved task requirements against recorded availability, location and prerequisite status, then propose assignments for the mobilization lead. After approval, issue assignment details and track acknowledgements, routing cancellations or delays back for rescheduling.
✓ Shorter time to confirmed resource assignments.
À partir de 89 EUR
07FONCTIONNEMENT DE L'ÉQUIPE
Weather and Tide Review Checkpoints
Le défiOperational plans can reference an older forecast or tide window after conditions or task timing change. Administrative reminders alone do not establish whether a lift, tow or refloating attempt is safe.
Ce que nous pouvons construireAssociate each planned activity with the forecast issue time, tide reference and review deadline selected by the responsible professional. Flag stale inputs and schedule changes for renewed review, recording the authorized decision without generating an automatic go or no-go instruction.
✓ Fewer activities awaiting an overdue conditions review.
À partir de 89 EUR
08FONCTIONNEMENT DE L'ÉQUIPE
Diving Work-Pack Readiness Tracking
Le défiDiving work packs may lack a current personnel record, equipment document, communications check record or approved task attachment. Missing paperwork can remain hidden until the team reaches the site.
Ce que nous pouvons construireCheck submitted work-pack contents against a checklist maintained by the diving supervisor and request missing or unreadable records from their owners. Present a readiness exceptions list for supervisor sign-off, without assessing fitness to dive, decompression requirements or operational safety.
✓ Fewer missing diving work-pack records.
À partir de 89 EUR
09FONCTIONNEMENT DE L'ÉQUIPE
Salvage Equipment Maintenance and Spares Planning
Le défiDewatering pumps, compressors, hydraulic power packs and cutting equipment accumulate service requirements across jobs. Maintenance dates and spare-parts needs may not be visible when the next casualty response begins.
Ce que nous pouvons construireUse asset records, service intervals and reported running hours to generate maintenance tasks and proposed spare-parts requests. Route overdue service and missing records to the equipment manager, who confirms serviceability and authorizes any deployment or purchase.
✓ Moins de tâches d'entretien des équipements en retard.
À partir de 89 EUR
10FONCTIONNEMENT DE L'ÉQUIPE
Subcontractor Certificate Expiry Monitoring
Le défiTug providers, crane contractors and specialist salvage subcontractors submit insurance and qualification documents with different expiry dates. A document being present does not establish that it covers the proposed work.
Ce que nous pouvons construireRecord document type, issuer, stated scope and expiry date against each subcontractor, then request renewals before the configured review deadline. Flag missing or apparently mismatched documents for procurement and operational review rather than automatically declaring the supplier compliant.
✓ Fewer expired subcontractor documents awaiting review.
À partir de 49 EUR
11FONCTIONNEMENT DE L'ÉQUIPE
Hired Equipment Delivery Exception Routing
Le défiA delayed generator, pump manifold or lifting accessory can affect an entire mobilization sequence. Supplier updates often reach one coordinator without reaching the person managing the receiving location.
Ce que nous pouvons construireTrack supplier acknowledgements, promised arrival times and receiving contacts against approved hire orders. When a delivery is late or its status changes, notify the mobilization lead and receiving coordinator with the affected equipment and dependencies for human replanning.
✓ Earlier visibility of equipment delivery exceptions.
À partir de 89 EUR
12FONCTIONNEMENT DE L'ÉQUIPE
Recovered Waste Transfer Record Matching
Le défiRecovered oily water, contaminated debris and other waste streams can generate transfer records that do not clearly reference the casualty or collection batch. Missing handover evidence complicates closeout and environmental reporting.
Ce que nous pouvons construireAssign administrative batch references and link collection logs, transporter details, destination records and receipt documents supplied by the responsible parties. Flag missing quantities, inconsistent units and absent receipts for the environmental lead, who validates classification, routing and reporting requirements.
✓ Fewer unmatched waste transfer records.
À partir de 89 EUR
13FONCTIONNEMENT DE L'ÉQUIPE
Recovered Property Custody Register
Le défiMachinery, cargo and other recovered property may move from the casualty to a barge, temporary yard and final recipient. Handwritten descriptions and missing release acknowledgements make custody difficult to reconstruct.
Ce que nous pouvons construireCreate item or lot references linked to photographs, recovery location and recorded condition, then capture each transfer with its sender, recipient and timestamp. Flag missing acknowledgements and require authorized ownership and release instructions before preparing a transfer pack.
✓ More complete recovered-property custody records.
À partir de 89 EUR
14COMMUNICATION AVEC LES CLIENTS
Approved Stakeholder Situation Updates
Le défiOwners, insurers, appointed surveyors and port contacts need updates, but not every recipient should receive the same commercial or technical information. Rewriting separate messages can introduce inconsistencies.
Ce que nous pouvons construireDraft recipient-specific situation reports from approved progress records, showing the reporting period, confirmed milestones and open information requests. Apply an approved distribution matrix and require the project lead to authorize content and recipients before sending.
✓ Shorter preparation time for stakeholder updates.
À partir de 89 EUR
15COMMUNICATION AVEC LES CLIENTS
Client Query Triage and Response Escalation
Le défiRoutine requests for photographs or progress reports can arrive alongside urgent questions about changing conditions or disputed instructions. Treating every message as a standard service ticket can delay the right response.
Ce que nous pouvons construireClassify queries by casualty, requested information and urgency indicators, then route them to the agreed operational, commercial or administrative owner. Track response targets and escalate unanswered items, while directing emergencies to established emergency channels rather than relying on automated triage.
✓ Fewer overdue client responses.
À partir de 49 EUR
16COMMUNICATION AVEC LES CLIENTS
Owner and Insurer Project Onboarding
Le défiA newly instructed salvage project may start without a verified reporting contact, billing entity, approval chain or document-sharing arrangement. These gaps create avoidable delays once urgent work is underway.
Ce que nous pouvons construireOpen an onboarding checklist for the instructing party and request the agreed contact, billing and authorization information. Track completion, route inconsistencies to the project administrator and keep missing administrative items visible without treating the checklist as contractual authority to start work.
✓ Fewer unresolved project onboarding items.
À partir de 69 EUR
17DOCUMENTS ET INFORMATIONS
Casualty Expense Evidence and Billing Packs
Le défiTransport charges, equipment hire, accommodation and subcontractor invoices can arrive without clear casualty codes or supporting approval references. Commercial teams spend time reconstructing the basis for each proposed charge.
Ce que nous pouvons construireMatch expense records to casualty codes, approved work packages and available purchase or authorization references. Assemble draft billing evidence and route duplicates, missing support and uncertain chargeability to the project accountant or commercial lead for review.
✓ Fewer unsupported expense items in draft billing packs.
À partir de 89 EUR
18DOCUMENTS ET INFORMATIONS
Crew Timesheet Validation and Billing Routing
Le défiCrew timesheets may overlap between casualties or omit whether recorded time relates to travel, standby or active work. Unchecked entries can create payroll questions and disputed client charges.
Ce que nous pouvons construireCompare submitted entries with assigned jobs, recorded shifts and configured coding rules, flagging overlaps and missing activity descriptions. Route exceptions to supervisors and send approved records to the appropriate billing workflow without independently deciding pay entitlement or contractual recoverability.
✓ Fewer unresolved timesheet exceptions.
À partir de 49 EUR
19MARKETING ET CROISSANCE
Planned Wreck Removal Enquiry Qualification
Le défiPlanned wreck removal enquiries often omit access conditions, available surveys, ownership authority or the intended contracting route. Estimators may begin work before they know whether the request fits the contractor's capabilities.
Ce que nous pouvons construireCapture vessel location, stated condition, requested scope, available survey documents and procurement timetable in a structured enquiry record. Flag missing information and compare the request with company-defined service criteria for commercial review, keeping emergency casualties on the designated response path.
✓ More complete enquiries reaching estimators.
À partir de 89 EUR
20MARKETING ET CROISSANCE
Salvage Tender Drafting and Approval Routing
Le défiTender teams repeatedly assemble company information, scope descriptions and submission schedules while technical assumptions continue to change. An outdated scope attachment can undermine an otherwise complete proposal.
Ce que nous pouvons construireBuild a draft proposal from approved templates, the current enquiry record and reviewer-supplied technical and commercial inputs. Check required sections and attachment versions, then route the draft to engineering, commercial and legal reviewers before authorized submission.
✓ Fewer incomplete tender submissions.
À partir de 49 EUR
21MARKETING ET CROISSANCE
Salvage Tender Clarification and Follow-Up
Le défiAfter a wreck removal proposal is submitted, buyer clarifications and decision dates can be spread across several contacts. Follow-up may continue even after a tender is paused, awarded or materially revised.
Ce que nous pouvons construireTrack the submitted proposal version, buyer's stated timetable and outstanding clarification requests against the opportunity. Schedule approved follow-ups, pause them when status changes, and route technical or commercial questions to their owners rather than generating commitments automatically.
✓ Fewer overdue tender follow-up actions.
À partir de 69 EUR
Les prix de départ affichés sont des estimations indicatives arrondies à des fins commerciales et peuvent différer de ceux indiqués lors du paiement sur WooCommerce. Le prix à payer et la devise sont confirmés séparément. Référence pour un workflow personnalisé : 399 PLN avant conversion.