01الوثائق والمعلومات
AIRAC Amendment Package Readiness
التحديAIP amendment contributions arrive with inconsistent references, missing attachments or unclear reviewer ownership. Publication coordinators must reconcile them against the applicable AIRAC schedule.
ما يمكننا بناؤهRegister each submission against the coordinator-supplied schedule, check required fields and attachments, and request missing material from named contributors. Route a source-linked readiness checklist to authorised reviewers without validating content or releasing a publication.
✓ Fewer incomplete amendment packages at review.
ابتداءً من 379 ريال سعودي
02الوثائق والمعلومات
Inter-Unit Letter of Agreement Review Tracking
التحديLetters of Agreement between ATS units can accumulate unresolved comments and unsigned revisions. Teams may struggle to establish which version is awaiting each party's review.
ما يمكننا بناؤهTrack the controlled revision, participating units, comment owners and approval status in a review register. Send reminders for outstanding responses and assemble the agreed draft for authorised operational and legal review before signature or implementation.
✓ Fewer overdue LoA review actions.
ابتداءً من 379 ريال سعودي
03الوثائق والمعلومات
Safety Occurrence Evidence Assembly
التحديSafety investigators may need to request supporting records from several custodians after an occurrence. Unstructured requests make it difficult to see which evidence has been received and who may access it.
ما يمكننا بناؤهCreate an access-controlled evidence checklist using investigator-defined requirements, record source identifiers and track requests to approved custodians. Flag missing items without altering original evidence, determining reportability or generating causal conclusions.
✓ Less time spent assembling investigation evidence.
ابتداءً من 379 ريال سعودي
04الوثائق والمعلومات
CNS Supplier Certificate Expiry Follow-Up
التحديSupplier certificates and qualification documents for CNS equipment or technical services may expire without a clear renewal owner. Procurement staff must repeatedly check document dates and chase replacements.
ما يمكننا بناؤهRecord certificate type, supplier, stated expiry date and responsible reviewer, then issue reminders using approved lead times. Route replacement documents for technical or procurement acceptance rather than treating a current date as proof of suitability.
✓ Fewer supplier records with unresolved document expiries.
ابتداءً من 189 ريال سعودي
05الوثائق والمعلومات
Controlled Administrative Knowledge Updates
التحديSupport teams may answer airspace-user administrative questions from obsolete contact lists, billing instructions or service-request guidance. Updates are difficult to propagate consistently across internal reference material.
ما يمكننا بناؤهCompare approved administrative source documents with knowledge-base entries and draft referenced updates for the content owner. Suggest answers only from released material, excluding live operational instructions and real-time ATC advice.
✓ Fewer administrative answers based on superseded guidance.
ابتداءً من 289 ريال سعودي
06التواصل مع العملاء
Airspace-User Administrative Inbox Routing
التحديA shared ANSP mailbox receives airline billing enquiries, airport contact changes and general service questions. Manual forwarding can leave requests unassigned or duplicate work across departments.
ما يمكننا بناؤهClassify administrative messages, extract organisation and reference details, and assign cases to the appropriate support queue. Flag messages suggesting operational urgency for staff attention and provide approved instructions for established operational channels.
✓ Shorter administrative request assignment time.
ابتداءً من 139 ريال سعودي
07التواصل مع العملاء
New Aircraft Operator Account Onboarding
التحديA new operator's administrative account setup can stall while billing contacts, company details or required forms remain incomplete. Different departments may request the same information separately.
ما يمكننا بناؤهCreate an onboarding checklist, validate required field presence and send approved requests for missing administrative information. Route completed records to the account owner for verification without granting flight permissions or operational access.
✓ Shorter administrative account setup cycle.
ابتداءً من 289 ريال سعودي
08التواصل مع العملاء
Contracted Service Enquiry Escalation
التحديAirport customers and contracted service users may have agreed response targets for administrative or technical support enquiries. Cases can exceed those targets when ownership changes between teams.
ما يمكننا بناؤهAssociate each case with its approved support terms, track acknowledgement and response deadlines, and escalate approaching breaches to the designated service manager. Keep contractual support timers separate from operational incident and emergency procedures.
✓ Fewer overdue contracted support responses.
ابتداءً من 189 ريال سعودي
09التواصل مع العملاء
Airline and Airport Feedback Consolidation
التحديFeedback about ANSP briefings, consultation processes and administrative services arrives through surveys, meetings and support cases. Repeated issues may remain hidden across separate records.
ما يمكننا بناؤهGroup approved feedback by service topic, organisation type and recurring issue, retaining links to the original submissions. Prepare improvement briefs for service owners and route potential safety concerns through the established human-led safety process.
✓ Shorter time to identify recurring service issues.
ابتداءً من 289 ريال سعودي
10التواصل مع العملاء
Air Navigation Charge Dispute Preparation
التحديOperators disputing air navigation charges may provide incomplete invoice references or unclear descriptions of the flights concerned. Billing staff must gather the missing details before investigating.
ما يمكننا بناؤهRequest the relevant invoice, flight identifiers and dispute reason, then assemble a case linked to authorised billing records. Route discrepancies to billing specialists without determining charge liability, changing tariffs or issuing credits autonomously.
✓ Fewer billing disputes awaiting basic supporting details.
ابتداءً من 379 ريال سعودي
11عمليات الفريق
CNS Maintenance Ticket Assignment
التحديEngineering fault reports may omit asset identifiers, site details or useful diagnostic attachments. Dispatch coordinators must clarify the report before assigning a suitable technician.
ما يمكننا بناؤهExtract the reported asset and symptoms, request missing information, and suggest a queue using approved asset-criticality and escalation rules. Require engineering confirmation for safety-related priority decisions and keep operational incident notification on established channels.
✓ تقليل الوقت المستغرق في تخصيص تذاكر الصيانة.
ابتداءً من 379 ريال سعودي
12عمليات الفريق
Preventive Maintenance and Spares Preparation
التحديScheduled work on communication, navigation and surveillance assets can be delayed when job packs and required spares are checked too late. Maintenance planners must reconcile due dates with material availability.
ما يمكننا بناؤهRead approved maintenance intervals and parts requirements, prepare draft work schedules, and flag stock gaps before planning review. Generate spare-part requisition drafts for approval while leaving outage timing, technical release and return to service with authorised teams.
✓ Fewer planned maintenance jobs delayed by missing spares.
ابتداءً من 379 ريال سعودي
13عمليات الفريق
Controller Shift-Swap Review Coordination
التحديA proposed ATCO shift swap requires checks against locally applicable roster rules, recorded qualifications and availability. Supervisors may need to gather this information manually before deciding.
ما يمكننا بناؤهCollect the swap request and compare it with approved roster constraints and current authorised personnel records, flagging missing or conflicting information. Route the proposal to the responsible supervisor, with human review mandatory for fatigue, competence, staffing and final roster approval.
✓ Shorter shift-swap review turnaround.
ابتداءً من 289 ريال سعودي
14عمليات الفريق
Recurrent Training Evidence Follow-Up
التحديCompletion records for recurrent technical, safety or operational training may sit across learning records and departmental files. Training coordinators must chase missing evidence before scheduled reviews.
ما يمكننا بناؤهCompare approved role-based training requirements with recorded completions, notify staff of upcoming due dates and request missing evidence. Escalate unresolved gaps to the training manager without inferring competence or authorising operational duties.
✓ Fewer overdue training evidence requests.
ابتداءً من 189 ريال سعودي
15عمليات الفريق
Planned CNS Outage Coordination Pack
التحديA proposed CNS outage may require engineering, ATS, airport and aeronautical information stakeholders to review the same planning details. Missing acknowledgements make coordination status difficult to establish.
ما يمكننا بناؤهAssemble the proposed asset, work scope, requested window, dependencies and contingency references into a controlled coordination pack. Track stakeholder responses and outstanding conditions while leaving outage authorisation, operational restrictions and any NOTAM action to authorised personnel.
✓ Fewer unacknowledged dependencies at outage review.
ابتداءً من 379 ريال سعودي
16عمليات الفريق
Critical CNS Supplier Delivery Exceptions
التحديA delayed replacement component or specialist service visit can disrupt an approved maintenance plan. Procurement and engineering may discover changed supplier dates at different times.
ما يمكننا بناؤهCompare supplier acknowledgements and delivery updates with approved purchase-order dates, then flag exceptions to procurement and the maintenance planner. Request a revised commitment and record its effect on the draft plan without substituting parts or approving technical alternatives.
✓ Shorter supplier delay escalation time.
ابتداءً من 379 ريال سعودي
17عمليات الفريق
CNS Procurement Invoice Exception Routing
التحديInvoices for equipment, maintenance services or installation milestones may not match approved purchase orders. Finance staff need technical owners to explain line-item, price or milestone discrepancies.
ما يمكننا بناؤهCompare invoice lines with the corresponding approved purchase order and flag mismatched quantities, prices or references. Route exceptions with supporting records to procurement, finance or the named technical owner before payment approval.
✓ Fewer unresolved purchase-order invoice discrepancies.
ابتداءً من 289 ريال سعودي
18عمليات الفريق
Safety and Engineering Meeting Action Follow-Up
التحديCross-functional meetings can leave maintenance dependencies and safety-related follow-up tasks scattered across personal notes. Owners may disagree about due dates or whether an action has been accepted.
ما يمكننا بناؤهUse an authorised recording or supplied notes to draft minutes, action owners and proposed due dates for chair approval. Distribute only the approved action register and track updates, requiring the designated authority to accept evidence and close safety-related actions.
✓ Fewer overdue meeting actions.
ابتداءً من 379 ريال سعودي
19التسويق والنمو
Managed ATS Service Proposal Assembly
التحديPreparing a proposal for airport ATS or related service provision requires coordinated commercial, staffing, technical and scope inputs. Reusing old proposal text can introduce unsupported commitments.
ما يمكننا بناؤهBuild a draft from approved service descriptions and the buyer's requirements, marking unanswered items and source references. Route technical capabilities, staffing assumptions, safety responsibilities and commercial terms to their respective reviewers before submission.
✓ Shorter proposal approval cycle.
ابتداءً من 189 ريال سعودي
20التسويق والنمو
Airport Service Opportunity Qualification
التحديEnquiries for tower services, CNS support or airspace-related consultancy may arrive without enough scope information for a bid decision. Commercial teams need a consistent way to identify relevant opportunities.
ما يمكننا بناؤهExtract the requesting organisation, service location, requested scope, procurement dates and stated requirements into a draft opportunity record. Request missing details and prepare a qualification brief for commercial and technical review without asserting licensing eligibility or delivery capability.
✓ More complete opportunities at bid qualification.
ابتداءً من 379 ريال سعودي
21التسويق والنمو
Airport Service Contract Renewal Briefs
التحديRenewal discussions for contracted ANSP services can begin without a consolidated view of notice dates, agreed scope and unresolved customer issues. Commercial teams must gather this context from separate records.
ما يمكننا بناؤهTrack contractual renewal and notice dates, then assemble a brief from approved service records, customer requests and open actions. Route possible scope changes to commercial, operational and safety reviewers before any offer or commitment.
✓ Fewer renewals entering review without preparation.
ابتداءً من 379 ريال سعودي
الأسعار المبدئية المعروضة هي تقديرات إرشادية تم تقريبها لأغراض تسويقية، وقد تختلف عن السعر النهائي عند الدفع عبر WooCommerce. يتم تأكيد السعر النهائي والعملة بشكل منفصل. خط الأساس لسير العمل المخصص: 399 زلوتي بولندي قبل التحويل.